How many new homes are being built in Brawley, CA?
In 2025, building permits were issued for 54 new homes in Brawley, in 54 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 54, buildings of two to four homes 0, buildings of five or more homes 0.
Over the five years from 2021 to 2025, permits were issued for 593 new homes in Brawley, about 6.9 for every 100 homes that stood there in 2020–2024.
The permits put the construction cost at $146,079 per new home, on average.
Figures last updated on .
- New homes authorized, 2025
- 54
- New homes authorized, 2021–2025
- 593
- Per 100 existing homes
- 6.9
- Construction cost per home
- $146,079
New homes authorized in Brawley
| Year | New homes | Single-family houses | In buildings of 2 to 4 homes | In buildings of 5 or more homes |
|---|---|---|---|---|
| 2021 | 227 | 158 | 9 | 60 |
| 2022 | 162 | 162 | 0 | 0 |
| 2023 | 81 | 81 | 0 | 0 |
| 2024 | 69 | 37 | 0 | 32 |
| 2025 | 54 | 54 | 0 | 0 |
A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
New homes authorized in places near Brawley, 2021–2025
| Place | Distance | New homes | Per 100 existing homes |
|---|---|---|---|
| Brawley | — | 593 | 6.9 |
| Westmorland | 6.9 mi | 21 | 3.5 |
| El Centro | 13 mi | 244 | 1.7 |
| Somerton | 55 mi | 129 | 2.5 |
Distance is measured in a straight line between the Census Bureau’s internal points for each place.
New construction across Imperial County, 2021–2025
| Rank | Place | New homes | Per 100 existing homes |
|---|---|---|---|
| 1 | Brawley | 593 | 6.9 |
| 2 | Westmorland | 21 | 3.5 |
| 3 | El Centro | 244 | 1.7 |
Brawley ranks 1 of 3 places in Imperial County by new homes authorized over five years for every 100 existing homes.
Newer homes in Brawley against Imperial County, its state and the nation
| Brawley | Imperial County | California | United States | |
|---|---|---|---|---|
| Built 2020 or later | 1.1% (±0.9 points) | 2.1% (±0.7 points) | 1.3% (±0.1 points) | 2.0% |
| Built 2010 to 2019 | 12.3% (±2.9 points) | 9.1% (±1.0 points) | 6.5% (±0.1 points) | 9.4% |
| Rental vacancy rate | 2.4% (±2.4 points) | 3.3% (±1.3 points) | 4.2% (±0.1 points) | 5.5% |
In Brawley, the share of homes built in 2020 or later is not measurably different from Imperial County (2.1%).
It is not measurably different from California (1.3%).
It is not measurably different from the national figure (2.0%).
Survey years: 2020–2024 (American Community Survey 5-year estimates).
Margins of error are at the 90% confidence level.
What you can do on Seayora in Brawley
One account for renting, owning, managing and fixing homes, with these figures beside you.
Own or manage a rental?
List it, sign the lease and collect rent online, with the figures for Brawley beside you.
Create a landlord account · See what landlords get
Looking for a place to rent?
Browse homes for rent near Brawley, save the ones you like and apply online.
Browse rentals · Create a renter account
Do repairs, renovations or maintenance?
Get found by owners and renters near Brawley, and send estimates and invoices from your phone.
Questions about Brawley
How many new homes are being built in Brawley?
In 2025, building permits were issued for 54 new homes in Brawley, in 54 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 54, buildings of two to four homes 0, buildings of five or more homes 0.
How much does it cost to build a new home in Brawley?
The permits put the construction cost at $146,079 per new home, on average.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
Which place in Imperial County is building the most new homes?
Over 2021–2025, Brawley authorized the most new homes in Imperial County for its size: 6.9 for every 100 existing homes (593 in all).
Is a building permit the same as a finished home?
No: a permit authorizes a home to be built; some are built years later and some never are.
Sources
- Selected Housing Characteristics (DP04), 2020–2024 ACS 5-year estimates — Brawley city, California
- US Census Bureau, Building Permits Survey, annual place files 2021–2025
This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.
Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.
Figures last updated on .
Related
- Housing in Brawley at a glance
- Median rent in Brawley
- Rent by bedrooms in Brawley
- Rent burden in Brawley
- Renters and owners in Brawley
- Income and affordability in Brawley
- Home values in Brawley
- Homeowner costs in Brawley
- Property taxes in Brawley
- Types of homes in Brawley
- Bedrooms in Brawley
- Age of homes in Brawley
- Vacancy rate in Brawley
- Heating fuel in Brawley
- Commute and cars in Brawley
- Crime reported to police in Brawley
- Population growth in Brawley
- How long people stay in Brawley
- Crowding and facilities in Brawley
- Education in Brawley
- Poverty in Brawley
- Jobs and unemployment in Brawley
- Health insurance in Brawley
- Demographics of Brawley
- Population of Brawley
- California landlord and tenant rules
- Housing across Imperial County
- Housing data for every place in California