How many new homes are being built in Calimesa, CA?

In 2025, building permits were issued for 2 new homes in Calimesa, in 2 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 2, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 103 new homes in Calimesa, about 2.5 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $155,000 per new home, on average.

Figures last updated on .

New homes authorized, 2025
2
New homes authorized, 2021–2025
103
Per 100 existing homes
2.5
Construction cost per home
$155,000

New homes authorized in Calimesa

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021686800
2022141400
2023131300
20246600
20252200

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Calimesa, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Calimesa—1032.5
Yucaipa3.3 mi7033.7
Redlands8.1 mi1,1624.4
Banning9.3 mi1,1028.9
Beaumont9.6 mi2,29512.7
Moreno Valley9.7 mi2,6114.6
Highland11 mi1,1026.6
San Jacinto13 mi1,0046.5

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Riverside County, 2021–2025

RankPlaceNew homesPer 100 existing homes
10Desert Hot Springs7906.3
11Palm Desert1,8565.0
12La Quinta1,2024.9
13Rancho Mirage7014.7
14Moreno Valley2,6114.6
15Cathedral City5952.6
16Calimesa1032.5
17Corona8711.7
18Blythe30.1

Calimesa ranks 16 of 18 places in Riverside County by new homes authorized over five years for every 100 existing homes.

Newer homes in Calimesa against Riverside County, its state and the nation

Estimate (90% margin of error)
CalimesaRiverside CountyCaliforniaUnited States
Built 2020 or later8.4% (±3.7 points)2.0% (±0.1 points)1.3% (±0.1 points)2.0%
Built 2010 to 201914.4% (±5.0 points)9.4% (±0.2 points)6.5% (±0.1 points)9.4%
Rental vacancy rate13.8% (±19.6 points)5.0% (±0.5 points)4.2% (±0.1 points)5.5%

In Calimesa, the share of homes built in 2020 or later is higher than in Riverside County (2.0%).

It is also higher than in California (1.3%).

It is higher than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Calimesa

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Calimesa beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Calimesa, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Calimesa, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Calimesa

How many new homes are being built in Calimesa?

In 2025, building permits were issued for 2 new homes in Calimesa, in 2 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 2, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Calimesa?

The permits put the construction cost at $155,000 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Riverside County is building the most new homes?

Over 2021–2025, Beaumont authorized the most new homes in Riverside County for its size: 12.7 for every 100 existing homes (2,295 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related