How many new homes are being built in Key West, FL?

In 2025, building permits were issued for 29 new homes in Key West, in 21 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 19, buildings of two to four homes 2, buildings of five or more homes 8.

Over the five years from 2021 to 2025, permits were issued for 305 new homes in Key West, about 2.1 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $632,954 per new home, on average.

Figures last updated on .

New homes authorized, 2025
29
New homes authorized, 2021–2025
305
Per 100 existing homes
2.1
Construction cost per home
$632,954

New homes authorized in Key West

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021121200
2022212100
20232163135150
2024271890
2025291928

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Key West, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Key West—3052.1
Marathon49 mi5097.8
Key Colony Beach49 mi151.4
Islamorada83 mi2514.2
Marco Island95 mi7674.1
Homestead104 mi2,5949.4

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Monroe County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Marathon5097.8
2Islamorada2514.2
3Key West3052.1
4Key Colony Beach151.4

Key West ranks 3 of 4 places in Monroe County by new homes authorized over five years for every 100 existing homes.

Newer homes in Key West against Monroe County, its state and the nation

Estimate (90% margin of error)
Key WestMonroe CountyFloridaUnited States
Built 2020 or later0.6% (±0.6 points)1.4% (±0.4 points)3.2% (±0.1 points)2.0%
Built 2010 to 20193.4% (±1.3 points)9.1% (±0.9 points)11.0% (±0.1 points)9.4%
Rental vacancy rate13.1% (±3.3 points)19.6% (±2.6 points)7.6% (±0.2 points)5.5%

In Key West, the share of homes built in 2020 or later is lower than in Monroe County (1.4%).

It is also lower than in Florida (3.2%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Key West

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Key West beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Key West, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Key West, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Key West

How many new homes are being built in Key West?

In 2025, building permits were issued for 29 new homes in Key West, in 21 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 19, buildings of two to four homes 2, buildings of five or more homes 8.

How much does it cost to build a new home in Key West?

The permits put the construction cost at $632,954 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Monroe County is building the most new homes?

Over 2021–2025, Marathon authorized the most new homes in Monroe County for its size: 7.8 for every 100 existing homes (509 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related