How many new homes are being built in North Bay Village, FL?

In 2025, building permits were issued for 342 new homes in North Bay Village, in 10 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 9, buildings of two to four homes 0, buildings of five or more homes 333.

Over the five years from 2021 to 2025, permits were issued for 397 new homes in North Bay Village, about 8.8 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $286,395 per new home, on average.

Figures last updated on .

New homes authorized, 2025
342
New homes authorized, 2021–2025
397
Per 100 existing homes
8.8
Construction cost per home
$286,395

New homes authorized in North Bay Village

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
20211100
2022540054
20230000
20240000
202534290333

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near North Bay Village, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
North Bay Village—3978.8
Miami Shores2.1 mi340.9
Indian Creek2.2 mi14.8
Surfside2.6 mi1223.2
North Miami3.7 mi6733.1
North Miami Beach5.7 mi1,3877.9

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Miami-Dade County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1South Miami83416.1
2Miami29,27513.1
3Homestead2,5949.4
4North Bay Village3978.8
5North Miami Beach1,3877.9
6Doral2,2537.8
7Hialeah4,2645.4
8Indian Creek14.8
9Sweetwater3144.4
10Pinecrest2303.6

North Bay Village ranks 4 of 18 places in Miami-Dade County by new homes authorized over five years for every 100 existing homes.

Newer homes in North Bay Village against Miami-Dade County, its state and the nation

Estimate (90% margin of error)
North Bay VillageMiami-Dade CountyFloridaUnited States
Built 2020 or later0.0% (±1.2 points)1.9% (±0.1 points)3.2% (±0.1 points)2.0%
Built 2010 to 20199.8% (±3.7 points)9.5% (±0.3 points)11.0% (±0.1 points)9.4%
Rental vacancy rate7.1% (±6.9 points)5.5% (±0.3 points)7.6% (±0.2 points)5.5%

In North Bay Village, the share of homes built in 2020 or later is lower than in Miami-Dade County (1.9%).

It is also lower than in Florida (3.2%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in North Bay Village

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for North Bay Village beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near North Bay Village, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near North Bay Village, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about North Bay Village

How many new homes are being built in North Bay Village?

In 2025, building permits were issued for 342 new homes in North Bay Village, in 10 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 9, buildings of two to four homes 0, buildings of five or more homes 333.

How much does it cost to build a new home in North Bay Village?

The permits put the construction cost at $286,395 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Miami-Dade County is building the most new homes?

Over 2021–2025, South Miami authorized the most new homes in Miami-Dade County for its size: 16.1 for every 100 existing homes (834 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related