How many new homes are being built in Clarkesville, GA?
In 2025, building permits were issued for 11 new homes in Clarkesville, in 11 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 11, buildings of two to four homes 0, buildings of five or more homes 0.
Over the five years from 2021 to 2025, permits were issued for 133 new homes in Clarkesville, about 14.7 for every 100 homes that stood there in 2020–2024.
The permits put the construction cost at $465,844 per new home, on average.
Figures last updated on .
- New homes authorized, 2025
- 11
- New homes authorized, 2021–2025
- 133
- Per 100 existing homes
- 14.7
- Construction cost per home
- $465,844
New homes authorized in Clarkesville
| Year | New homes | Single-family houses | In buildings of 2 to 4 homes | In buildings of 5 or more homes |
|---|---|---|---|---|
| 2021 | 93 | 17 | 4 | 72 |
| 2022 | 9 | 9 | 0 | 0 |
| 2023 | 10 | 10 | 0 | 0 |
| 2024 | 10 | 10 | 0 | 0 |
| 2025 | 11 | 11 | 0 | 0 |
A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
New homes authorized in places near Clarkesville, 2021–2025
| Place | Distance | New homes | Per 100 existing homes |
|---|---|---|---|
| Clarkesville | — | 133 | 14.7 |
| Mount Airy | 6.2 mi | 35 | 7.7 |
| Alto | 10 mi | 7 | 1.7 |
| Tallulah Falls | 11 mi | 8 | 8.0 |
| Toccoa | 12 mi | 117 | 2.9 |
| Cleveland | 13 mi | 74 | 4.6 |
| Clermont | 16 mi | 8 | 1.7 |
| Lula | 16 mi | 44 | 3.8 |
| Homer | 19 mi | 279 | 43.3 |
Distance is measured in a straight line between the Census Bureau’s internal points for each place.
New construction across Habersham County, 2021–2025
| Rank | Place | New homes | Per 100 existing homes |
|---|---|---|---|
| 1 | Clarkesville | 133 | 14.7 |
| 2 | Mount Airy | 35 | 7.7 |
| 3 | Alto | 7 | 1.7 |
Clarkesville ranks 1 of 3 places in Habersham County by new homes authorized over five years for every 100 existing homes.
Newer homes in Clarkesville against Habersham County, its state and the nation
| Clarkesville | Habersham County | Georgia | United States | |
|---|---|---|---|---|
| Built 2020 or later | 1.3% (±1.2 points) | 2.2% (±0.6 points) | 2.7% (±0.1 points) | 2.0% |
| Built 2010 to 2019 | 3.1% (±2.2 points) | 5.2% (±1.1 points) | 11.6% (±0.2 points) | 9.4% |
| Rental vacancy rate | 4.4% (±6.7 points) | 3.2% (±1.8 points) | 6.8% (±0.2 points) | 5.5% |
In Clarkesville, the share of homes built in 2020 or later is not measurably different from Habersham County (2.2%).
It is lower than in Georgia (2.7%).
It is not measurably different from the national figure (2.0%).
Survey years: 2020–2024 (American Community Survey 5-year estimates).
Margins of error are at the 90% confidence level.
What you can do on Seayora in Clarkesville
One account for renting, owning, managing and fixing homes, with these figures beside you.
Own or manage a rental?
List it, sign the lease and collect rent online, with the figures for Clarkesville beside you.
Create a landlord account · See what landlords get
Looking for a place to rent?
Browse homes for rent near Clarkesville, save the ones you like and apply online.
Browse rentals · Create a renter account
Do repairs, renovations or maintenance?
Get found by owners and renters near Clarkesville, and send estimates and invoices from your phone.
Questions about Clarkesville
How many new homes are being built in Clarkesville?
In 2025, building permits were issued for 11 new homes in Clarkesville, in 11 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 11, buildings of two to four homes 0, buildings of five or more homes 0.
How much does it cost to build a new home in Clarkesville?
The permits put the construction cost at $465,844 per new home, on average.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
Which place in Habersham County is building the most new homes?
Over 2021–2025, Clarkesville authorized the most new homes in Habersham County for its size: 14.7 for every 100 existing homes (133 in all).
Is a building permit the same as a finished home?
No: a permit authorizes a home to be built; some are built years later and some never are.
Sources
- Selected Housing Characteristics (DP04), 2020–2024 ACS 5-year estimates — Clarkesville city, Georgia
- US Census Bureau, Building Permits Survey, annual place files 2021–2025
This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.
Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.
Figures last updated on .
Related
- Housing in Clarkesville at a glance
- Median rent in Clarkesville
- Rent by bedrooms in Clarkesville
- Rent burden in Clarkesville
- Renters and owners in Clarkesville
- Income and affordability in Clarkesville
- Home values in Clarkesville
- Homeowner costs in Clarkesville
- Property taxes in Clarkesville
- Types of homes in Clarkesville
- Bedrooms in Clarkesville
- Age of homes in Clarkesville
- Heating fuel in Clarkesville
- Commute and cars in Clarkesville
- Population growth in Clarkesville
- How long people stay in Clarkesville
- Education in Clarkesville
- Poverty in Clarkesville
- Demographics of Clarkesville
- Population of Clarkesville
- Georgia landlord and tenant rules
- Housing across Habersham County
- Housing data for every place in Georgia