How many new homes are being built in Limington, ME?

In 2025, building permits were issued for 20 new homes in Limington, in 20 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 20, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 148 new homes in Limington, about 8.5 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $284,339 per new home, on average.

Figures last updated on .

New homes authorized, 2025
20
New homes authorized, 2021–2025
148
Per 100 existing homes
8.5
Construction cost per home
$284,339

New homes authorized in Limington

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021434300
2022313100
2023292900
2024252500
2025202000

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Limington, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Limington—1488.5
Limerick5.7 mi20512.8
Hiram9.7 mi627.2
Buxton11 mi1684.3

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across York County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Limerick20512.8
2Arundel1548.5
3Limington1488.5
4Lebanon1786.6
5York5386.1
6Sanford4954.8
7Kennebunkport1244.3
8Buxton1684.3
9Alfred543.9

Limington ranks 3 of 10 places in York County by new homes authorized over five years for every 100 existing homes.

Newer homes in Limington against York County, its state and the nation

Estimate (90% margin of error)
LimingtonYork CountyMaineUnited States
Built 2020 or later0.6% (±1.0 points)1.9% (±0.3 points)1.4% (±0.1 points)2.0%
Built 2010 to 201910.0% (±5.3 points)8.6% (±0.6 points)7.1% (±0.2 points)9.4%
Rental vacancy rate0.0% (±17.3 points)5.2% (±1.5 points)4.2% (±0.4 points)5.5%

In Limington, the share of homes built in 2020 or later is lower than in York County (1.9%).

It is not measurably different from Maine (1.4%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Limington

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Limington beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Limington, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Limington, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Limington

How many new homes are being built in Limington?

In 2025, building permits were issued for 20 new homes in Limington, in 20 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 20, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Limington?

The permits put the construction cost at $284,339 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in York County is building the most new homes?

Over 2021–2025, Limerick authorized the most new homes in York County for its size: 12.8 for every 100 existing homes (205 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related