How many new homes are being built in St. Joseph, MI?

In 2025, building permits were issued for 68 new homes in St. Joseph, in 10 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 8, buildings of two to four homes 4, buildings of five or more homes 56.

Over the five years from 2021 to 2025, permits were issued for 128 new homes in St. Joseph, about 2.6 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $166,251 per new home, on average.

Figures last updated on .

New homes authorized, 2025
68
New homes authorized, 2021–2025
128
Per 100 existing homes
2.6
Construction cost per home
$166,251

New homes authorized in St. Joseph

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021221606
2022201505
20239900
20249720
2025688456

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near St. Joseph, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
St. Joseph—1282.6
St. Joseph Charter Township2.2 mi250.5
Royalton Township6.4 mi955.3
Hagar Township8.7 mi381.7
Bainbridge Township11 mi151.1
Pipestone Township11 mi141.5

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Berrien County, 2021–2025

RankPlaceNew homesPer 100 existing homes
3Royalton Township955.3
4Watervliet Township995.0
5Lake Charter Township734.8
6Buchanan Township844.6
7Bertrand Township333.0
8Chikaming Township1033.0
9St. Joseph1282.6
10Niles Township1292.2
11Hagar Township381.7
12Pipestone Township141.5
13Coloma Charter Township361.2
14Bainbridge Township151.1
15Bridgman80.7

St. Joseph ranks 9 of 17 places in Berrien County by new homes authorized over five years for every 100 existing homes.

Newer homes in St. Joseph against Berrien County, its state and the nation

Estimate (90% margin of error)
St. JosephBerrien CountyMichiganUnited States
Built 2020 or later0.2% (±0.3 points)0.8% (±0.2 points)1.0% (±0.1 points)2.0%
Built 2010 to 20192.2% (±1.4 points)3.2% (±0.4 points)4.9% (±0.1 points)9.4%
Rental vacancy rate0.0% (±1.6 points)4.5% (±1.4 points)5.1% (±0.2 points)5.5%

In St. Joseph, the share of homes built in 2020 or later is lower than in Berrien County (0.8%).

It is also lower than in Michigan (1.0%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in St. Joseph

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for St. Joseph beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near St. Joseph, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near St. Joseph, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about St. Joseph

How many new homes are being built in St. Joseph?

In 2025, building permits were issued for 68 new homes in St. Joseph, in 10 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 8, buildings of two to four homes 4, buildings of five or more homes 56.

How much does it cost to build a new home in St. Joseph?

The permits put the construction cost at $166,251 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Berrien County is building the most new homes?

Over 2021–2025, Watervliet authorized the most new homes in Berrien County for its size: 8.4 for every 100 existing homes (61 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related