How many new homes are being built in Arden Hills, MN?

In 2025, a building permit was issued for one new home in Arden Hills, according to the Census Bureau’s Building Permits Survey.

Over the five years from 2021 to 2025, permits were issued for 151 new homes in Arden Hills, about 5.1 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $533,427 per new home, on average.

Figures last updated on .

New homes authorized, 2025
1
New homes authorized, 2021–2025
151
Per 100 existing homes
5.1
Construction cost per home
$533,427

New homes authorized in Arden Hills

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
202114610145
20221100
20231100
20242200
20251100

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Arden Hills, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Arden Hills—1515.1
Shoreview1.5 mi5865.1
Mounds View3.2 mi1252.2
St. Anthony (Hennepin County)3.7 mi68815.0
Roseville3.9 mi5433.3
North Oaks3.9 mi1457.7
Columbia Heights4.2 mi3643.9
Lexington4.6 mi30724.6
Fridley4.7 mi3082.4

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Ramsey County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Lauderdale1189.5
2Little Canada4018.2
3North Oaks1457.7
4Vadnais Heights4367.6
5North St. Paul2865.8
6Arden Hills1515.1
7Shoreview5865.1
8Roseville5433.3
9Maplewood5093.2
10Mounds View1252.2
11Gem Lake21.0
12White Bear Township210.5

Arden Hills ranks 6 of 14 places in Ramsey County by new homes authorized over five years for every 100 existing homes.

Newer homes in Arden Hills against Ramsey County, its state and the nation

Estimate (90% margin of error)
Arden HillsRamsey CountyMinnesotaUnited States
Built 2020 or later0.8% (±0.8 points)1.3% (±0.2 points)1.9% (±0.1 points)2.0%
Built 2010 to 201910.5% (±3.5 points)5.1% (±0.4 points)8.5% (±0.1 points)9.4%
Rental vacancy rate2.1% (±3.5 points)6.1% (±0.7 points)5.3% (±0.3 points)5.5%

In Arden Hills, the share of homes built in 2020 or later is not measurably different from Ramsey County (1.3%).

It is lower than in Minnesota (1.9%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Arden Hills

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Arden Hills beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Arden Hills, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Arden Hills, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Arden Hills

How many new homes are being built in Arden Hills?

In 2025, a building permit was issued for one new home in Arden Hills, according to the Census Bureau’s Building Permits Survey.

Over the five years from 2021 to 2025, permits were issued for 151 new homes in Arden Hills, about 5.1 for every 100 homes that stood there in 2020–2024.

How much does it cost to build a new home in Arden Hills?

The permits put the construction cost at $533,427 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Ramsey County is building the most new homes?

Over 2021–2025, Lauderdale authorized the most new homes in Ramsey County for its size: 9.5 for every 100 existing homes (118 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related