How old are the homes in New Prague, MN?

33.7% (±8.4 points) of the homes in New Prague, MN were built before 1980 (2020–2024 American Community Survey).

13.7% were built before 1940.

7.8% were built in 2010 or later.

Figures last updated on .

Built before 1980
33.7% (±8.4 points)
Built before 1940
13.7%
Built 2010 or later
7.8%

When the homes in New Prague were built

Housing units by year structure built, 2020–2024
Year builtNew PragueScott CountyMinnesotaUnited States
2020 or later1.6% (±1.3 points)2.6%1.9%2.0%
2010 to 20196.2% (±2.7 points)13.3%8.5%9.4%
2000 to 200934.0% (±6.3 points)27.1%13.3%13.6%
1990 to 199912.9% (±6.3 points)21.2%12.2%12.4%
1980 to 198911.6% (±3.7 points)12.4%12.0%12.9%
1970 to 19795.3% (±2.6 points)9.8%14.2%14.2%
1960 to 19692.8% (±1.8 points)4.3%9.1%9.9%
1950 to 19596.8% (±4.3 points)3.5%9.1%9.5%
1940 to 19495.1% (±3.2 points)1.0%4.1%4.4%
1939 or earlier13.7% (±5.6 points)4.6%15.6%11.7%

In New Prague, the share of homes built before 1980 is higher than in Scott County (23.2%).

It is also lower than in Minnesota (52.1%).

It is lower than the national figure (49.7%).

In Scott County, New Prague ranks 9 of 18 places with a published estimate, from highest to lowest share of homes built before 1980.

Statewide, it ranks 2419 of 2,629.

Rankings use the estimates alone; where margins of error overlap, neighboring ranks may not truly differ.

Why the age of a home matters: lead-based paint

Federal law treats housing built before 1978 as likely to contain lead-based paint.

Before a lease or sale of most pre-1978 housing, the landlord or seller must disclose any known lead-based paint and hazards and give the tenant or buyer the EPA pamphlet (42 U.S.C. § 4852d; 40 CFR part 745, subpart F; 24 CFR part 35, subpart A).

A contractor paid to renovate, repair or paint a pre-1978 home must be a certified firm, use a certified renovator and follow lead-safe work practices under the Renovation, Repair and Painting Rule (40 CFR part 745, subpart E) whenever the job disturbs more than 6 square feet of painted surface in a room or more than 20 square feet outside; window replacement and demolition always count (40 CFR 745.83).

Certification comes from EPA, or from the state where EPA has authorized the state to run the program.

The Census Bureau groups construction by decade, so the share built before 1978 lies between the share built before 1970 (28.4%) and the share built before 1980 (33.7%).

Homes built before 1980 in places near New Prague

Nearest places with a published estimate, compared with New Prague
PlaceDistanceHomes built before 1980Compared with this place
New Prague—33.7% (±8.4 points)—
Helena Township3.1 mi38.6% (±9.8 points)Not measurably different
Lanesburgh Township3.6 mi43.4% (±8.1 points)Not measurably different
Heidelberg4.4 mi54.2% (±44.7 points)Not measurably different
Wheatland Township5.9 mi67.0% (±13.0 points)Higher
Cedar Lake Township6.3 mi29.5% (±7.3 points)Not measurably different
Derrynane Township6.9 mi64.9% (±15.1 points)Higher
Montgomery7.0 mi63.7% (±11.4 points)Higher
Belle Plaine Township7.2 mi46.4% (±11.7 points)Not measurably different

Nearby places with a measurably higher figure: Wheatland Township, MN (67.0%), Derrynane Township, MN (64.9%), Montgomery, MN (63.7%).

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

Homes built before 1980 across Scott County, place by place

RankPlaceHomes built before 1980
3Belle Plaine Township46.4% (±11.7 points)
4New Market Township42.4% (±12.6 points)
5Credit River41.6% (±8.8 points)
6Spring Lake Township40.4% (±11.4 points)
7Helena Township38.6% (±9.8 points)
8Louisville Township (Scott County)35.4% (±11.1 points)
9New Prague33.7% (±8.4 points)
10St. Lawrence Township31.0% (±15.6 points)
11Belle Plaine30.6% (±7.8 points)
12Cedar Lake Township29.5% (±7.3 points)
13Jordan28.5% (±8.6 points)
14Jackson Township26.3% (±12.4 points)
15Shakopee21.9% (±3.0 points)

Showing 13 of 18 places in Scott County, ranked from highest to lowest.

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in New Prague

One account for renting, owning, managing and fixing homes, with these figures beside you.

Do repairs, renovations or maintenance?

Get found by owners and renters near New Prague, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for New Prague beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near New Prague, save the ones you like and apply online.

Browse rentals · Create a renter account

Questions about New Prague

How old are most homes in New Prague?

33.7% of homes in New Prague, MN were built before 1980 (2020–2024 American Community Survey).

Do homes in New Prague need a lead paint disclosure?

A home built before 1978 does, before it is rented or sold, unless an exemption applies (42 U.S.C. § 4852d); between 28.4% and 33.7% of homes in New Prague were built before then.

Does a contractor need lead certification to work on older homes in New Prague?

Yes, when the job disturbs more than 6 square feet of paint in a room or 20 square feet outside, or replaces a window: the firm must be certified and a certified renovator must direct the work under the Renovation, Repair and Painting Rule (40 CFR part 745, subpart E).

Sources

To check these figures in the Census Bureau’s own API, request the variables below from the 2024 ACS 5-year data profile (acs/acs5/profile) for New Prague city, Minnesota (place:45808, in state:27).

Each estimate (E or PE) has a margin of error beside it (M or PM).

The API needs a free key.

Request a Census API key.

DP04_0017PE, DP04_0017PM, DP04_0018PE, DP04_0018PM, DP04_0019PE, DP04_0019PM, DP04_0020PE, DP04_0020PM, DP04_0021PE, DP04_0021PM, DP04_0022PE, DP04_0022PM, DP04_0023PE, DP04_0023PM, DP04_0024PE, DP04_0024PM, DP04_0025PE, DP04_0025PM, DP04_0026PE, DP04_0026PM

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related