How many new homes are being built in Pearl, MS?

In 2025, building permits were issued for 118 new homes in Pearl, in 118 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 118, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 703 new homes in Pearl, about 5.8 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $183,969 per new home, on average.

Figures last updated on .

New homes authorized, 2025
118
New homes authorized, 2021–2025
703
Per 100 existing homes
5.8
Construction cost per home
$183,969

New homes authorized in Pearl

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
202115115100
202213813800
202312912900
202416716700
202511811800

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Pearl, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Pearl—7035.8
Richland4.9 mi1214.0
Brandon5.9 mi3303.4
Florence8.3 mi733.9
Ridgeland11 mi1791.5
Madison14 mi3913.8
Clinton16 mi2081.9

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Rankin County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Pearl7035.8
2Richland1214.0
3Florence733.9
4Brandon3303.4

Pearl ranks 1 of 4 places in Rankin County by new homes authorized over five years for every 100 existing homes.

Newer homes in Pearl against Rankin County, its state and the nation

Estimate (90% margin of error)
PearlRankin CountyMississippiUnited States
Built 2020 or later1.7% (±1.2 points)2.1% (±0.5 points)1.7% (±0.1 points)2.0%
Built 2010 to 20197.1% (±1.5 points)14.9% (±1.6 points)11.0% (±0.2 points)9.4%
Rental vacancy rate4.5% (±2.6 points)5.8% (±2.0 points)8.2% (±0.4 points)5.5%

In Pearl, the share of homes built in 2020 or later is not measurably different from Rankin County (2.1%).

It is not measurably different from Mississippi (1.7%).

It is not measurably different from the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Pearl

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Pearl beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Pearl, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Pearl, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Pearl

How many new homes are being built in Pearl?

In 2025, building permits were issued for 118 new homes in Pearl, in 118 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 118, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Pearl?

The permits put the construction cost at $183,969 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Rankin County is building the most new homes?

Over 2021–2025, Pearl authorized the most new homes in Rankin County for its size: 5.8 for every 100 existing homes (703 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related