How many new homes are being built in Moscow Mills, MO?

In 2025, building permits were issued for 140 new homes in Moscow Mills, in 69 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 40, buildings of two to four homes 52, buildings of five or more homes 48.

Over the five years from 2021 to 2025, permits were issued for 332 new homes in Moscow Mills, about 23.7 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $118,393 per new home, on average.

Figures last updated on .

New homes authorized, 2025
140
New homes authorized, 2021–2025
332
Per 100 existing homes
23.7
Construction cost per home
$118,393

New homes authorized in Moscow Mills

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021535300
2022342086
2023262330
20247957220
2025140405248

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Moscow Mills, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Moscow Mills—33223.7
Troy2.9 mi5069.8
Wentzville9.2 mi1,91511.5
Winfield10 mi61.0
Hawk Point11 mi82.9
St. Paul12 mi26921.3
Lake St. Louis14 mi1,17415.3
Warrenton14 mi56715.1

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Lincoln County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Moscow Mills33223.7
2Troy5069.8
3Hawk Point82.9
4Elsberry172.3
5Winfield61.0

Moscow Mills ranks 1 of 5 places in Lincoln County by new homes authorized over five years for every 100 existing homes.

Newer homes in Moscow Mills against Lincoln County, its state and the nation

Estimate (90% margin of error)
Moscow MillsLincoln CountyMissouriUnited States
Built 2020 or later11.3% (±6.4 points)4.2% (±1.0 points)1.6% (±0.1 points)2.0%
Built 2010 to 201933.7% (±12.3 points)15.8% (±2.0 points)8.0% (±0.1 points)9.4%
Rental vacancy rate3.6% (±5.9 points)1.5% (±1.6 points)5.0% (±0.2 points)5.5%

In Moscow Mills, the share of homes built in 2020 or later is higher than in Lincoln County (4.2%).

It is also higher than in Missouri (1.6%).

It is higher than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Moscow Mills

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Moscow Mills beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Moscow Mills, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Moscow Mills, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Moscow Mills

How many new homes are being built in Moscow Mills?

In 2025, building permits were issued for 140 new homes in Moscow Mills, in 69 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 40, buildings of two to four homes 52, buildings of five or more homes 48.

How much does it cost to build a new home in Moscow Mills?

The permits put the construction cost at $118,393 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Lincoln County is building the most new homes?

Over 2021–2025, Moscow Mills authorized the most new homes in Lincoln County for its size: 23.7 for every 100 existing homes (332 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related