How many new homes are being built in Pacific, MO?
In 2025, building permits were issued for 4 new homes in Pacific, in 4 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 4, buildings of two to four homes 0, buildings of five or more homes 0.
Over the five years from 2021 to 2025, permits were issued for 238 new homes in Pacific, about 7.4 for every 100 homes that stood there in 2020–2024.
The permits put the construction cost at $335,000 per new home, on average.
Figures last updated on .
- New homes authorized, 2025
- 4
- New homes authorized, 2021–2025
- 238
- Per 100 existing homes
- 7.4
- Construction cost per home
- $335,000
New homes authorized in Pacific
| Year | New homes | Single-family houses | In buildings of 2 to 4 homes | In buildings of 5 or more homes |
|---|---|---|---|---|
| 2021 | 25 | 21 | 4 | 0 |
| 2022 | 66 | 62 | 4 | 0 |
| 2023 | 119 | 117 | 2 | 0 |
| 2024 | 24 | 18 | 6 | 0 |
| 2025 | 4 | 4 | 0 | 0 |
A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
New homes authorized in places near Pacific, 2021–2025
| Place | Distance | New homes | Per 100 existing homes |
|---|---|---|---|
| Pacific | — | 238 | 7.4 |
| Byrnes Mill | 9.9 mi | 11 | 0.9 |
| Cedar Hill Lakes | 11 mi | 0 | 0.0 |
| Parkdale | 12 mi | 1 | 1.3 |
| Clarkson Valley | 13 mi | 0 | 0.0 |
Distance is measured in a straight line between the Census Bureau’s internal points for each place.
New construction across Franklin County, 2021–2025
| Rank | Place | New homes | Per 100 existing homes |
|---|---|---|---|
| 1 | Oak Grove Village | 127 | 65.8 |
| 2 | Union | 688 | 12.7 |
| 3 | Washington | 868 | 12.6 |
| 4 | Pacific | 238 | 7.4 |
| 5 | St. Clair | 115 | 5.2 |
Pacific ranks 4 of 5 places in Franklin County by new homes authorized over five years for every 100 existing homes.
Newer homes in Pacific against Franklin County, its state and the nation
| Pacific | Franklin County | Missouri | United States | |
|---|---|---|---|---|
| Built 2020 or later | 1.3% (±1.3 points) | 1.5% (±0.4 points) | 1.6% (±0.1 points) | 2.0% |
| Built 2010 to 2019 | 10.1% (±3.2 points) | 9.6% (±1.0 points) | 8.0% (±0.1 points) | 9.4% |
| Rental vacancy rate | 4.0% (±4.8 points) | 6.4% (±2.2 points) | 5.0% (±0.2 points) | 5.5% |
In Pacific, the share of homes built in 2020 or later is not measurably different from Franklin County (1.5%).
It is not measurably different from Missouri (1.6%).
It is not measurably different from the national figure (2.0%).
Survey years: 2020–2024 (American Community Survey 5-year estimates).
Margins of error are at the 90% confidence level.
What you can do on Seayora in Pacific
One account for renting, owning, managing and fixing homes, with these figures beside you.
Own or manage a rental?
List it, sign the lease and collect rent online, with the figures for Pacific beside you.
Create a landlord account · See what landlords get
Looking for a place to rent?
Browse homes for rent near Pacific, save the ones you like and apply online.
Browse rentals · Create a renter account
Do repairs, renovations or maintenance?
Get found by owners and renters near Pacific, and send estimates and invoices from your phone.
Questions about Pacific
How many new homes are being built in Pacific?
In 2025, building permits were issued for 4 new homes in Pacific, in 4 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 4, buildings of two to four homes 0, buildings of five or more homes 0.
How much does it cost to build a new home in Pacific?
The permits put the construction cost at $335,000 per new home, on average.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
Which place in Franklin County is building the most new homes?
Over 2021–2025, Oak Grove Village authorized the most new homes in Franklin County for its size: 65.8 for every 100 existing homes (127 in all).
Is a building permit the same as a finished home?
No: a permit authorizes a home to be built; some are built years later and some never are.
Sources
- Selected Housing Characteristics (DP04), 2020–2024 ACS 5-year estimates — Pacific city, Missouri
- US Census Bureau, Building Permits Survey, annual place files 2021–2025
This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.
Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.
Figures last updated on .
Related
- Housing in Pacific at a glance
- Median rent in Pacific
- Rent by bedrooms in Pacific
- Rent burden in Pacific
- Renters and owners in Pacific
- Income and affordability in Pacific
- Home values in Pacific
- Homeowner costs in Pacific
- Property taxes in Pacific
- Types of homes in Pacific
- Bedrooms in Pacific
- Age of homes in Pacific
- Heating fuel in Pacific
- Commute and cars in Pacific
- Crime reported to police in Pacific
- Population growth in Pacific
- How long people stay in Pacific
- Crowding and facilities in Pacific
- Education in Pacific
- Poverty in Pacific
- Demographics of Pacific
- Population of Pacific
- Missouri landlord and tenant rules
- Housing across Franklin County
- Housing data for every place in Missouri