How many new homes are being built in the Town of Chili, NY?

In 2025, building permits were issued for 29 new homes in the Town of Chili, in 20 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 17, buildings of two to four homes 12, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 291 new homes in the Town of Chili, about 2.4 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $386,707 per new home, on average.

Figures last updated on .

New homes authorized, 2025
29
New homes authorized, 2021–2025
291
Per 100 existing homes
2.4
Construction cost per home
$386,707

New homes authorized in the Town of Chili

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021177460131
2022434300
2023171700
20242515010
20252917120

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near the Town of Chili, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Town of Chili—2912.4
Village of Scottsville4.4 mi10.1
Town of Henrietta5.7 mi1,3016.9
Town of Wheatland6.4 mi291.3
Town of Riga6.5 mi622.6
Town of Ogden6.8 mi2763.5
Village of Churchville7.0 mi454.3
Village of Spencerport7.8 mi161.0
Town of Brighton (Monroe County)8.6 mi410.2

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Monroe County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Town of Henrietta1,3016.9
2Town of Mendon1734.9
3Town of Ogden2763.5
4Town of Sweden1833.4
5Town of Parma1662.7
6Town of Riga622.6
7Town of Chili2912.4
8Town of Rush322.2
9Town of Pittsford2232.1
10Town of Wheatland291.3
11Town of Penfield2071.3
12Town of Hamlin220.6
13Town of Irondequoit940.4

the Town of Chili ranks 7 of 15 places in Monroe County by new homes authorized over five years for every 100 existing homes.

Newer homes in the Town of Chili against Monroe County, its state and the nation

Estimate (90% margin of error)
Town of ChiliMonroe CountyNew YorkUnited States
Built 2020 or later1.4% (±0.7 points)0.8% (±0.1 points)0.8% (±0.1 points)2.0%
Built 2010 to 20195.0% (±1.7 points)5.0% (±0.3 points)5.3% (±0.1 points)9.4%
Rental vacancy rate4.4% (±4.2 points)5.0% (±0.5 points)3.8% (±0.1 points)5.5%

In the Town of Chili, the share of homes built in 2020 or later is not measurably different from Monroe County (0.8%).

It is not measurably different from New York (0.8%).

It is not measurably different from the national figure (2.0%).

A New York town includes the villages and hamlets inside it, so the figures for the Town of Chili include them.

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Town of Chili

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Town of Chili beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Town of Chili, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Town of Chili, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Town of Chili

How many new homes are being built in the Town of Chili?

In 2025, building permits were issued for 29 new homes in the Town of Chili, in 20 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 17, buildings of two to four homes 12, buildings of five or more homes 0.

How much does it cost to build a new home in the Town of Chili?

The permits put the construction cost at $386,707 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Monroe County is building the most new homes?

Over 2021–2025, the Town of Henrietta authorized the most new homes in Monroe County for its size: 6.9 for every 100 existing homes (1,301 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related