How many new homes are being built in the Town of Groveland, NY?

In 2025, building permits were issued for 6 new homes in the Town of Groveland, in 6 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 6, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 18 new homes in the Town of Groveland, about 2.5 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $413,333 per new home, on average.

Figures last updated on .

New homes authorized, 2025
6
New homes authorized, 2021–2025
18
Per 100 existing homes
2.5
Construction cost per home
$413,333

New homes authorized in the Town of Groveland

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
20212200
20222200
20235500
20243300
20256600

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near the Town of Groveland, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Town of Groveland—182.5
Village of Geneseo6.5 mi90.4
Town of Geneseo6.7 mi661.8
Town of Livonia9.0 mi651.9
Village of Livonia9.3 mi10.1
Town of Canadice11 mi211.8

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Livingston County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Town of Groveland182.5
2Town of Livonia651.9
3Town of Geneseo661.8
4Town of Lima231.4
5Town of York120.9
6Town of Caledonia80.4

the Town of Groveland ranks 1 of 6 places in Livingston County by new homes authorized over five years for every 100 existing homes.

Newer homes in the Town of Groveland against Livingston County, its state and the nation

Estimate (90% margin of error)
Town of GrovelandLivingston CountyNew YorkUnited States
Built 2020 or later0.0% (±5.8 points)0.4% (±0.2 points)0.8% (±0.1 points)2.0%
Built 2010 to 20196.7% (±4.5 points)3.7% (±0.7 points)5.3% (±0.1 points)9.4%
Rental vacancy rate10.6% (±11.9 points)2.1% (±1.2 points)3.8% (±0.1 points)5.5%

In the Town of Groveland, the share of homes built in 2020 or later is not measurably different from Livingston County (0.4%).

It is not measurably different from New York (0.8%).

It is not measurably different from the national figure (2.0%).

A New York town includes the villages and hamlets inside it, so the figures for the Town of Groveland include them.

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Town of Groveland

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Town of Groveland beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Town of Groveland, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Town of Groveland, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Town of Groveland

How many new homes are being built in the Town of Groveland?

In 2025, building permits were issued for 6 new homes in the Town of Groveland, in 6 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 6, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in the Town of Groveland?

The permits put the construction cost at $413,333 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Livingston County is building the most new homes?

Over 2021–2025, the Town of Groveland authorized the most new homes in Livingston County for its size: 2.5 for every 100 existing homes (18 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related