How many new homes are being built in the Town of Richmond, NY?

In 2025, building permits were issued for 4 new homes in the Town of Richmond, in 4 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 4, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 21 new homes in the Town of Richmond, about 1.0 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $350,000 per new home, on average.

Figures last updated on .

New homes authorized, 2025
4
New homes authorized, 2021–2025
21
Per 100 existing homes
1.0
Construction cost per home
$350,000

New homes authorized in the Town of Richmond

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
20218800
20227700
20230000
20242200
20254400

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near the Town of Richmond, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Town of Richmond—211.0
Town of Canadice5.4 mi211.8
Town of Livonia6.7 mi651.9
Village of Livonia7.6 mi10.1
Town of Lima8.3 mi231.4
Village of Bloomfield9.0 mi497.4
Town of East Bloomfield9.0 mi814.6
Town of South Bristol9.1 mi312.3
Village of Lima9.1 mi91.1

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Ontario County, 2021–2025

RankPlaceNew homesPer 100 existing homes
3Town of Gorham743.2
4Town of South Bristol312.3
5Town of Canadice211.8
6Town of Geneva321.6
7Canandaigua851.6
8Town of Manchester591.4
9Town of Richmond211.0
10Geneva (Ontario County)541.0

the Town of Richmond ranks 9 of 10 places in Ontario County by new homes authorized over five years for every 100 existing homes.

Newer homes in the Town of Richmond against Ontario County, its state and the nation

Estimate (90% margin of error)
Town of RichmondOntario CountyNew YorkUnited States
Built 2020 or later0.7% (±0.9 points)1.4% (±0.3 points)0.8% (±0.1 points)2.0%
Built 2010 to 20192.3% (±2.3 points)8.6% (±0.8 points)5.3% (±0.1 points)9.4%
Rental vacancy rate0.0% (±12.3 points)5.4% (±1.8 points)3.8% (±0.1 points)5.5%

In the Town of Richmond, the share of homes built in 2020 or later is not measurably different from Ontario County (1.4%).

It is not measurably different from New York (0.8%).

It is lower than the national figure (2.0%).

A New York town includes the villages and hamlets inside it, so the figures for the Town of Richmond include them.

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Town of Richmond

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Town of Richmond beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Town of Richmond, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Town of Richmond, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Town of Richmond

How many new homes are being built in the Town of Richmond?

In 2025, building permits were issued for 4 new homes in the Town of Richmond, in 4 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 4, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in the Town of Richmond?

The permits put the construction cost at $350,000 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Ontario County is building the most new homes?

Over 2021–2025, the Town of Farmington authorized the most new homes in Ontario County for its size: 9.4 for every 100 existing homes (558 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related