How many new homes are being built in the Village of Kaser, NY?

In 2025, building permits were issued for 12 new homes in the Village of Kaser, all in one new building, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 0, buildings of two to four homes 0, buildings of five or more homes 12.

Over the five years from 2021 to 2025, permits were issued for 80 new homes in the Village of Kaser, about 6.3 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $178,243 per new home, on average.

Figures last updated on .

New homes authorized, 2025
12
New homes authorized, 2021–2025
80
Per 100 existing homes
6.3
Construction cost per home
$178,243

New homes authorized in the Village of Kaser

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021250025
20227007
2023360036
20240000
2025120012

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near the Village of Kaser, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Village of Kaser—806.3
Village of Montebello2.3 mi100.6
Village of Wesley Hills2.6 mi482.9
Village of Chestnut Ridge2.7 mi541.8

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

Newer homes in the Village of Kaser against Rockland County, its state and the nation

Estimate (90% margin of error)
Village of KaserRockland CountyNew YorkUnited States
Built 2020 or later5.0% (±5.0 points)1.2% (±0.2 points)0.8% (±0.1 points)2.0%
Built 2010 to 201918.7% (±8.6 points)6.0% (±0.5 points)5.3% (±0.1 points)9.4%
Rental vacancy rate0.0% (±4.0 points)2.6% (±0.7 points)3.8% (±0.1 points)5.5%

In the Village of Kaser, the share of homes built in 2020 or later is not measurably different from Rockland County (1.2%).

It is not measurably different from New York (0.8%).

It is not measurably different from the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Village of Kaser

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Village of Kaser beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Village of Kaser, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Village of Kaser, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Village of Kaser

How many new homes are being built in the Village of Kaser?

In 2025, building permits were issued for 12 new homes in the Village of Kaser, all in one new building, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 0, buildings of two to four homes 0, buildings of five or more homes 12.

How much does it cost to build a new home in the Village of Kaser?

The permits put the construction cost at $178,243 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Rockland County is building the most new homes?

Over 2021–2025, the Town of Haverstraw authorized the most new homes in Rockland County for its size: 0.9 for every 100 existing homes (119 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related