How many new homes are being built in Seaside, OR?

In 2025, building permits were issued for 169 new homes in Seaside, in 27 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 16, buildings of two to four homes 0, buildings of five or more homes 153.

Over the five years from 2021 to 2025, permits were issued for 272 new homes in Seaside, about 5.4 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $161,176 per new home, on average.

Figures last updated on .

New homes authorized, 2025
169
New homes authorized, 2021–2025
272
Per 100 existing homes
5.4
Construction cost per home
$161,176

New homes authorized in Seaside

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021383800
2022262600
2023141400
2024252500
2025169160153

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Seaside, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Seaside—2725.4
Gearhart3.0 mi865.7
Warrenton13 mi652.2
Astoria15 mi260.5
Manzanita19 mi14010.6
Ilwaco23 mi101.5
Long Beach27 mi523.5
Cathlamet30 mi195.6
Clatskanie35 mi303.2

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Clatsop County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Gearhart865.7
2Seaside2725.4
3Warrenton652.2
4Astoria260.5

Seaside ranks 2 of 4 places in Clatsop County by new homes authorized over five years for every 100 existing homes.

Newer homes in Seaside against Clatsop County, its state and the nation

Estimate (90% margin of error)
SeasideClatsop CountyOregonUnited States
Built 2020 or later0.7% (±0.8 points)0.9% (±0.3 points)2.1% (±0.1 points)2.0%
Built 2010 to 20191.5% (±1.2 points)6.7% (±1.2 points)9.7% (±0.2 points)9.4%
Rental vacancy rate1.0% (±1.7 points)2.8% (±2.0 points)4.2% (±0.3 points)5.5%

In Seaside, the share of homes built in 2020 or later is not measurably different from Clatsop County (0.9%).

It is lower than in Oregon (2.1%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Seaside

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Seaside beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Seaside, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Seaside, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Seaside

How many new homes are being built in Seaside?

In 2025, building permits were issued for 169 new homes in Seaside, in 27 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 16, buildings of two to four homes 0, buildings of five or more homes 153.

How much does it cost to build a new home in Seaside?

The permits put the construction cost at $161,176 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Clatsop County is building the most new homes?

Over 2021–2025, Gearhart authorized the most new homes in Clatsop County for its size: 5.7 for every 100 existing homes (86 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related