How many new homes are being built in Shirley Township, PA?

In 2025, building permits were issued for 2 new homes in Shirley Township, in 2 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 2, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 13 new homes in Shirley Township, about 1.1 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $60,000 per new home, on average.

Figures last updated on .

New homes authorized, 2025
2
New homes authorized, 2021–2025
13
Per 100 existing homes
1.1
Construction cost per home
$60,000

New homes authorized in Shirley Township

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
20212200
20223300
20232200
20244400
20252200

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New construction across Huntingdon County, 2021–2025

RankPlaceNew homesPer 100 existing homes
2Todd Township (Huntingdon County)172.8
3Penn Township (Huntingdon County)192.8
4Warriors Mark Township202.5
5Cromwell Township131.8
6Miller Township (Huntingdon County)41.5
7Morris Township (Huntingdon County)31.3
8Shirley Township131.1
9West Township31.1
10Lincoln Township (Huntingdon County)21.0
11Walker Township (Huntingdon County)60.7
12Saltillo10.6
13Wood Township20.5
14Franklin Township (Huntingdon County)10.5

Shirley Township ranks 8 of 20 places in Huntingdon County by new homes authorized over five years for every 100 existing homes.

Newer homes in Shirley Township against Huntingdon County, its state and the nation

Estimate (90% margin of error)
Shirley TownshipHuntingdon CountyPennsylvaniaUnited States
Built 2020 or later0.0% (±2.8 points)0.3% (±0.1 points)1.0% (±0.1 points)2.0%
Built 2010 to 201911.5% (±4.3 points)5.4% (±0.6 points)5.1% (±0.1 points)9.4%
Rental vacancy rate0.0% (±21.1 points)3.0% (±1.3 points)4.9% (±0.2 points)5.5%

In Shirley Township, the share of homes built in 2020 or later is not measurably different from Huntingdon County (0.3%).

It is not measurably different from Pennsylvania (1.0%).

It is not measurably different from the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Shirley Township

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Shirley Township beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Shirley Township, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Shirley Township, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Shirley Township

How many new homes are being built in Shirley Township?

In 2025, building permits were issued for 2 new homes in Shirley Township, in 2 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 2, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Shirley Township?

The permits put the construction cost at $60,000 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Huntingdon County is building the most new homes?

Over 2021–2025, Dublin Township (Huntingdon County) authorized the most new homes in Huntingdon County for its size: 3.4 for every 100 existing homes (20 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related