How many new homes are being built in Church Hill, TN?

In 2025, building permits were issued for 10 new homes in Church Hill, in 10 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 10, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 100 new homes in Church Hill, about 2.9 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $270,258 per new home, on average.

Figures last updated on .

New homes authorized, 2025
10
New homes authorized, 2021–2025
100
Per 100 existing homes
2.9
Construction cost per home
$270,258

New homes authorized in Church Hill

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021121200
2022515100
2023121200
2024151500
2025101000

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Church Hill, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Church Hill—1002.9
Kingsport9.5 mi1,3274.8
Baileyton15 mi124.4
Jonesborough20 mi65123.4

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

Newer homes in Church Hill against Hawkins County, its state and the nation

Estimate (90% margin of error)
Church HillHawkins CountyTennesseeUnited States
Built 2020 or later0.4% (±0.7 points)1.0% (±0.5 points)3.0% (±0.1 points)2.0%
Built 2010 to 20194.2% (±2.4 points)7.3% (±1.2 points)12.0% (±0.2 points)9.4%
Rental vacancy rate12.0% (±18.1 points)3.9% (±3.1 points)6.1% (±0.3 points)5.5%

In Church Hill, the share of homes built in 2020 or later is not measurably different from Hawkins County (1.0%).

It is lower than in Tennessee (3.0%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Church Hill

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Church Hill beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Church Hill, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Church Hill, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Church Hill

How many new homes are being built in Church Hill?

In 2025, building permits were issued for 10 new homes in Church Hill, in 10 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 10, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Church Hill?

The permits put the construction cost at $270,258 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related