How many new homes are being built in Hondo, TX?

In 2025, building permits were issued for 8 new homes in Hondo, in 8 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 8, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 48 new homes in Hondo, about 1.7 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $236,662 per new home, on average.

Figures last updated on .

New homes authorized, 2025
8
New homes authorized, 2021–2025
48
Per 100 existing homes
1.7
Construction cost per home
$236,662

New homes authorized in Hondo

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021111100
20229900
2023111100
20249900
20258800

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Hondo, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Hondo—481.7
Castroville18 mi15912.1
LaCoste21 mi152.7
Bandera26 mi133.5
Somerset32 mi324.6
Helotes33 mi49015.8
Grey Forest34 mi51.4

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Medina County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Castroville15912.1
2LaCoste152.7
3Hondo481.7

Hondo ranks 3 of 3 places in Medina County by new homes authorized over five years for every 100 existing homes.

Newer homes in Hondo against Medina County, its state and the nation

Estimate (90% margin of error)
HondoMedina CountyTexasUnited States
Built 2020 or later0.0% (±1.7 points)3.4% (±1.0 points)4.0% (±0.1 points)2.0%
Built 2010 to 20195.6% (±3.7 points)20.2% (±2.3 points)17.4% (±0.1 points)9.4%
Rental vacancy rate5.6% (±6.8 points)5.6% (±3.2 points)7.7% (±0.1 points)5.5%

In Hondo, the share of homes built in 2020 or later is lower than in Medina County (3.4%).

It is also lower than in Texas (4.0%).

It is lower than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Hondo

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Hondo beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Hondo, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Hondo, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Hondo

How many new homes are being built in Hondo?

In 2025, building permits were issued for 8 new homes in Hondo, in 8 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 8, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Hondo?

The permits put the construction cost at $236,662 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Medina County is building the most new homes?

Over 2021–2025, Castroville authorized the most new homes in Medina County for its size: 12.1 for every 100 existing homes (159 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related