How many new homes are being built in Sour Lake, TX?

In 2025, building permits were issued for 12 new homes in Sour Lake, in 12 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 12, buildings of two to four homes 0, buildings of five or more homes 0.

Over the five years from 2021 to 2025, permits were issued for 71 new homes in Sour Lake, about 7.6 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $257,180 per new home, on average.

Figures last updated on .

New homes authorized, 2025
12
New homes authorized, 2021–2025
71
Per 100 existing homes
7.6
Construction cost per home
$257,180

New homes authorized in Sour Lake

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
2021201028
2022252500
20237700
20247700
2025121200

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Sour Lake, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Sour Lake—717.6
Beaumont16 mi1,1972.3
Kountze17 mi121.2
Silsbee20 mi80.2

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Hardin County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Sour Lake717.6
2Kountze121.2
3Silsbee80.2

Sour Lake ranks 1 of 3 places in Hardin County by new homes authorized over five years for every 100 existing homes.

Newer homes in Sour Lake against Hardin County, its state and the nation

Estimate (90% margin of error)
Sour LakeHardin CountyTexasUnited States
Built 2020 or later3.2% (±2.0 points)4.6% (±1.2 points)4.0% (±0.1 points)2.0%
Built 2010 to 201915.9% (±7.0 points)17.2% (±2.2 points)17.4% (±0.1 points)9.4%
Rental vacancy rate0.0% (±18.8 points)7.7% (±4.6 points)7.7% (±0.1 points)5.5%

In Sour Lake, the share of homes built in 2020 or later is not measurably different from Hardin County (4.6%).

It is not measurably different from Texas (4.0%).

It is not measurably different from the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Sour Lake

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Sour Lake beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Sour Lake, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Sour Lake, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Sour Lake

How many new homes are being built in Sour Lake?

In 2025, building permits were issued for 12 new homes in Sour Lake, in 12 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 12, buildings of two to four homes 0, buildings of five or more homes 0.

How much does it cost to build a new home in Sour Lake?

The permits put the construction cost at $257,180 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Hardin County is building the most new homes?

Over 2021–2025, Sour Lake authorized the most new homes in Hardin County for its size: 7.6 for every 100 existing homes (71 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related