How many new homes are being built in Santaquin, UT?

In 2025, building permits were issued for 231 new homes in Santaquin, in 169 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 157, buildings of two to four homes 4, buildings of five or more homes 70.

Over the five years from 2021 to 2025, permits were issued for 1,529 new homes in Santaquin, about 32.3 for every 100 homes that stood there in 2020–2024.

The permits put the construction cost at $369,082 per new home, on average.

Figures last updated on .

New homes authorized, 2025
231
New homes authorized, 2021–2025
1,529
Per 100 existing homes
32.3
Construction cost per home
$369,082

New homes authorized in Santaquin

Housing units authorized by building permits, by year
YearNew homesSingle-family housesIn buildings of 2 to 4 homesIn buildings of 5 or more homes
202156629333240
20222631467110
2023201132069
20242681761280
2025231157470

A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

New homes authorized in places near Santaquin, 2021–2025

Housing units authorized by building permits over the five years, and per 100 homes that stood in each place
PlaceDistanceNew homesPer 100 existing homes
Santaquin—1,52932.3
Rocky Ridge3.8 mi3718.6
Genola4.1 mi5612.3
Payson5.4 mi1,36119.0
Goshen5.8 mi206.5
Salem8.9 mi1,58553.0
Mona11 mi499.0
Spanish Fork13 mi2,29018.1
Mapleton16 mi1,85548.9

Distance is measured in a straight line between the Census Bureau’s internal points for each place.

New construction across Utah County, 2021–2025

RankPlaceNew homesPer 100 existing homes
1Saratoga Springs6,97455.4
2Salem1,58553.0
3Mapleton1,85548.9
4Santaquin1,52932.3
5Lehi7,02128.7
6Vineyard1,34428.2
7American Fork3,05925.6
8Payson1,36119.0
9Spanish Fork2,29018.1
10Highland86516.6

Santaquin ranks 4 of 18 places in Utah County by new homes authorized over five years for every 100 existing homes.

Newer homes in Santaquin against Utah County, its state and the nation

Estimate (90% margin of error)
SantaquinUtah CountyUtahUnited States
Built 2020 or later14.8% (±3.1 points)6.7% (±0.4 points)4.2% (±0.1 points)2.0%
Built 2010 to 201934.0% (±3.8 points)22.5% (±0.6 points)16.4% (±0.3 points)9.4%
Rental vacancy rate6.7% (±8.5 points)2.7% (±0.7 points)5.5% (±0.4 points)5.5%

In Santaquin, the share of homes built in 2020 or later is higher than in Utah County (6.7%).

It is also higher than in Utah (4.2%).

It is higher than the national figure (2.0%).

Survey years: 2020–2024 (American Community Survey 5-year estimates).

Margins of error are at the 90% confidence level.

What you can do on Seayora in Santaquin

One account for renting, owning, managing and fixing homes, with these figures beside you.

Own or manage a rental?

List it, sign the lease and collect rent online, with the figures for Santaquin beside you.

Create a landlord account · See what landlords get

Looking for a place to rent?

Browse homes for rent near Santaquin, save the ones you like and apply online.

Browse rentals · Create a renter account

Do repairs, renovations or maintenance?

Get found by owners and renters near Santaquin, and send estimates and invoices from your phone.

Join as a pro · Find a pro

Questions about Santaquin

How many new homes are being built in Santaquin?

In 2025, building permits were issued for 231 new homes in Santaquin, in 169 new buildings, according to the Census Bureau’s Building Permits Survey.

By type of building: single-family houses 157, buildings of two to four homes 4, buildings of five or more homes 70.

How much does it cost to build a new home in Santaquin?

The permits put the construction cost at $369,082 per new home, on average.

The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.

Which place in Utah County is building the most new homes?

Over 2021–2025, Saratoga Springs authorized the most new homes in Utah County for its size: 55.4 for every 100 existing homes (6,974 in all).

Is a building permit the same as a finished home?

No: a permit authorizes a home to be built; some are built years later and some never are.

Sources

This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.

Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.

Figures last updated on .

Related