How many new homes are being built in Bridgeport, WA?
In 2025, building permits were issued for 2 new homes in Bridgeport, all in one new building, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 0, buildings of two to four homes 2, buildings of five or more homes 0.
Over the five years from 2021 to 2025, permits were issued for 15 new homes in Bridgeport, about 2.1 for every 100 homes that stood there in 2020–2024.
The permits put the construction cost at $199,000 per new home, on average.
Figures last updated on .
- New homes authorized, 2025
- 2
- New homes authorized, 2021–2025
- 15
- Per 100 existing homes
- 2.1
- Construction cost per home
- $199,000
New homes authorized in Bridgeport
| Year | New homes | Single-family houses | In buildings of 2 to 4 homes | In buildings of 5 or more homes |
|---|---|---|---|---|
| 2021 | 1 | 1 | 0 | 0 |
| 2022 | 7 | 7 | 0 | 0 |
| 2023 | 1 | 1 | 0 | 0 |
| 2024 | 4 | 4 | 0 | 0 |
| 2025 | 2 | 0 | 2 | 0 |
A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
New homes authorized in places near Bridgeport, 2021–2025
| Place | Distance | New homes | Per 100 existing homes |
|---|---|---|---|
| Bridgeport | — | 15 | 2.1 |
| Brewster | 8.2 mi | 11 | 1.5 |
| Pateros | 11 mi | 16 | 5.6 |
| Mansfield | 14 mi | 3 | 2.0 |
| Chelan | 19 mi | 224 | 7.8 |
| Okanogan | 25 mi | 19 | 1.7 |
| Omak | 29 mi | 15 | 0.6 |
| Waterville | 31 mi | 10 | 1.9 |
| Grand Coulee | 31 mi | 3 | 0.5 |
Distance is measured in a straight line between the Census Bureau’s internal points for each place.
New construction across Douglas County, 2021–2025
| Rank | Place | New homes | Per 100 existing homes |
|---|---|---|---|
| 1 | Bridgeport | 15 | 2.1 |
| 2 | Mansfield | 3 | 2.0 |
| 3 | East Wenatchee | 108 | 1.9 |
| 4 | Waterville | 10 | 1.9 |
Bridgeport ranks 1 of 4 places in Douglas County by new homes authorized over five years for every 100 existing homes.
Newer homes in Bridgeport against Douglas County, its state and the nation
| Bridgeport | Douglas County | Washington | United States | |
|---|---|---|---|---|
| Built 2020 or later | 0.0% (±5.4 points) | 2.8% (±1.0 points) | 2.3% (±0.1 points) | 2.0% |
| Built 2010 to 2019 | 8.6% (±6.3 points) | 12.5% (±2.0 points) | 12.1% (±0.1 points) | 9.4% |
| Rental vacancy rate | 2.0% (±3.2 points) | 3.0% (±2.4 points) | 4.5% (±0.2 points) | 5.5% |
In Bridgeport, the share of homes built in 2020 or later is not measurably different from Douglas County (2.8%).
It is not measurably different from Washington (2.3%).
It is not measurably different from the national figure (2.0%).
Survey years: 2020–2024 (American Community Survey 5-year estimates).
Margins of error are at the 90% confidence level.
What you can do on Seayora in Bridgeport
One account for renting, owning, managing and fixing homes, with these figures beside you.
Own or manage a rental?
List it, sign the lease and collect rent online, with the figures for Bridgeport beside you.
Create a landlord account · See what landlords get
Looking for a place to rent?
Browse homes for rent near Bridgeport, save the ones you like and apply online.
Browse rentals · Create a renter account
Do repairs, renovations or maintenance?
Get found by owners and renters near Bridgeport, and send estimates and invoices from your phone.
Questions about Bridgeport
How many new homes are being built in Bridgeport?
In 2025, building permits were issued for 2 new homes in Bridgeport, all in one new building, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 0, buildings of two to four homes 2, buildings of five or more homes 0.
How much does it cost to build a new home in Bridgeport?
The permits put the construction cost at $199,000 per new home, on average.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
Which place in Douglas County is building the most new homes?
Over 2021–2025, Bridgeport authorized the most new homes in Douglas County for its size: 2.1 for every 100 existing homes (15 in all).
Is a building permit the same as a finished home?
No: a permit authorizes a home to be built; some are built years later and some never are.
Sources
- Selected Housing Characteristics (DP04), 2020–2024 ACS 5-year estimates — Bridgeport city, Washington
- US Census Bureau, Building Permits Survey, annual place files 2021–2025
This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.
Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.
Figures last updated on .
Related
- Housing in Bridgeport at a glance
- Median rent in Bridgeport
- Rent by bedrooms in Bridgeport
- Renters and owners in Bridgeport
- Income and affordability in Bridgeport
- Home values in Bridgeport
- Homeowner costs in Bridgeport
- Property taxes in Bridgeport
- Types of homes in Bridgeport
- Bedrooms in Bridgeport
- Age of homes in Bridgeport
- Heating fuel in Bridgeport
- Commute and cars in Bridgeport
- Population growth in Bridgeport
- Health insurance in Bridgeport
- Demographics of Bridgeport
- Population of Bridgeport
- Washington landlord and tenant rules
- Housing across Douglas County
- Housing data for every place in Washington