How many new homes are being built in Holyoke, MA?
In 2025, building permits were issued for 102 new homes in Holyoke, in 87 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 84, buildings of two to four homes 0, buildings of five or more homes 18.
Over the five years from 2021 to 2025, permits were issued for 131 new homes in Holyoke, about 0.8 for every 100 homes that stood there in 2020–2024.
The permits put the construction cost at $247,091 per new home, on average.
Figures last updated on .
- New homes authorized, 2025
- 102
- New homes authorized, 2021–2025
- 131
- Per 100 existing homes
- 0.8
- Construction cost per home
- $247,091
New homes authorized in Holyoke
| Year | New homes | Single-family houses | In buildings of 2 to 4 homes | In buildings of 5 or more homes |
|---|---|---|---|---|
| 2021 | 0 | 0 | 0 | 0 |
| 2022 | 5 | 3 | 2 | 0 |
| 2023 | 14 | 4 | 10 | 0 |
| 2024 | 10 | 4 | 6 | 0 |
| 2025 | 102 | 84 | 0 | 18 |
A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
New homes authorized in places near Holyoke, 2021–2025
| Place | Distance | New homes | Per 100 existing homes |
|---|---|---|---|
| Holyoke | — | 131 | 0.8 |
| South Hadley | 4.4 mi | 45 | 0.6 |
| Westhampton | 9.9 mi | 26 | 3.7 |
| Agawam Town | 10 mi | 179 | 1.4 |
Distance is measured in a straight line between the Census Bureau’s internal points for each place.
New construction across Hampden County, 2021–2025
| Rank | Place | New homes | Per 100 existing homes |
|---|---|---|---|
| 1 | Monson | 63 | 1.8 |
| 2 | Wilbraham | 102 | 1.8 |
| 3 | Agawam Town | 179 | 1.4 |
| 4 | Holyoke | 131 | 0.8 |
| 5 | Chester | 5 | 0.7 |
| 6 | Hampden | 13 | 0.7 |
| 7 | Longmeadow | 8 | 0.1 |
Holyoke ranks 4 of 7 places in Hampden County by new homes authorized over five years for every 100 existing homes.
Newer homes in Holyoke against Hampden County, its state and the nation
| Holyoke | Hampden County | Massachusetts | United States | |
|---|---|---|---|---|
| Built 2020 or later | 0.2% (±0.2 points) | 0.4% (±0.1 points) | 1.0% (±0.1 points) | 2.0% |
| Built 2010 to 2019 | 1.6% (±0.6 points) | 2.8% (±0.3 points) | 6.2% (±0.1 points) | 9.4% |
| Rental vacancy rate | 3.1% (±1.3 points) | 3.7% (±0.7 points) | 3.5% (±0.2 points) | 5.5% |
In Holyoke, the share of homes built in 2020 or later is not measurably different from Hampden County (0.4%).
It is lower than in Massachusetts (1.0%).
It is lower than the national figure (2.0%).
Survey years: 2020–2024 (American Community Survey 5-year estimates).
Margins of error are at the 90% confidence level.
What you can do on Seayora in Holyoke
One account for renting, owning, managing and fixing homes, with these figures beside you.
Own or manage a rental?
List it, sign the lease and collect rent online, with the figures for Holyoke beside you.
Create a landlord account · See what landlords get
Looking for a place to rent?
Browse homes for rent near Holyoke, save the ones you like and apply online.
Browse rentals · Create a renter account
Do repairs, renovations or maintenance?
Get found by owners and renters near Holyoke, and send estimates and invoices from your phone.
Questions about Holyoke
How many new homes are being built in Holyoke?
In 2025, building permits were issued for 102 new homes in Holyoke, in 87 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 84, buildings of two to four homes 0, buildings of five or more homes 18.
How much does it cost to build a new home in Holyoke?
The permits put the construction cost at $247,091 per new home, on average.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
Which place in Hampden County is building the most new homes?
Over 2021–2025, Monson authorized the most new homes in Hampden County for its size: 1.8 for every 100 existing homes (63 in all).
Is a building permit the same as a finished home?
No: a permit authorizes a home to be built; some are built years later and some never are.
Sources
- Selected Housing Characteristics (DP04), 2020–2024 ACS 5-year estimates — Holyoke city, Massachusetts
- US Census Bureau, Building Permits Survey, annual place files 2021–2025
This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.
Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.
Figures last updated on .
Related
- Housing in Holyoke at a glance
- Median rent in Holyoke
- Rent by bedrooms in Holyoke
- Rent burden in Holyoke
- Renters and owners in Holyoke
- Income and affordability in Holyoke
- Home values in Holyoke
- Homeowner costs in Holyoke
- Property taxes in Holyoke
- Types of homes in Holyoke
- Bedrooms in Holyoke
- Age of homes in Holyoke
- Vacancy rate in Holyoke
- Heating fuel in Holyoke
- Commute and cars in Holyoke
- Crime reported to police in Holyoke
- Population growth in Holyoke
- How long people stay in Holyoke
- Crowding and facilities in Holyoke
- Education in Holyoke
- Poverty in Holyoke
- Jobs and unemployment in Holyoke
- Health insurance in Holyoke
- Demographics of Holyoke
- Population of Holyoke
- Massachusetts landlord and tenant rules
- Housing across Hampden County
- Housing data for every place in Massachusetts