How many new homes are being built in Genoa City, WI?
In 2025, building permits were issued for 19 new homes in Genoa City, in 15 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 11, buildings of two to four homes 8, buildings of five or more homes 0.
Over the five years from 2021 to 2025, permits were issued for 23 new homes in Genoa City, about 2.0 for every 100 homes that stood there in 2020–2024.
The permits put the construction cost at $237,895 per new home, on average.
Figures last updated on .
- New homes authorized, 2025
- 19
- New homes authorized, 2021–2025
- 23
- Per 100 existing homes
- 2.0
- Construction cost per home
- $237,895
New homes authorized in Genoa City
| Year | New homes | Single-family houses | In buildings of 2 to 4 homes | In buildings of 5 or more homes |
|---|---|---|---|---|
| 2021 | 0 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 0 | 0 |
| 2023 | 0 | 0 | 0 | 0 |
| 2024 | 4 | 2 | 2 | 0 |
| 2025 | 19 | 11 | 8 | 0 |
A permit authorizes a home to be built; it does not count homes finished, and a year appears only when every permit office in the place reported all twelve months.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
New homes authorized in places near Genoa City, 2021–2025
| Place | Distance | New homes | Per 100 existing homes |
|---|---|---|---|
| Genoa City | — | 23 | 2.0 |
| Richmond | 3.0 mi | 35 | 2.5 |
| Bloomfield | 3.4 mi | 83 | 4.1 |
| Richmond Township | 3.7 mi | 35 | 1.2 |
| Spring Grove | 5.6 mi | 55 | 2.8 |
| Town of Randall | 5.8 mi | 80 | 4.8 |
| Hebron Township | 6.0 mi | 13 | 1.5 |
| Burton Township (McHenry County) | 6.3 mi | 55 | 3.1 |
| Town of Wheatland (Kenosha County) | 6.5 mi | 39 | 2.7 |
Distance is measured in a straight line between the Census Bureau’s internal points for each place.
New construction across Walworth County, 2021–2025
| Rank | Place | New homes | Per 100 existing homes |
|---|---|---|---|
| 1 | Delavan | 487 | 11.5 |
| 2 | Lake Geneva | 480 | 9.2 |
| 3 | East Troy | 119 | 4.9 |
| 4 | Bloomfield | 83 | 4.1 |
| 5 | Genoa City | 23 | 2.0 |
| 6 | Darien | 8 | 1.5 |
| 7 | Elkhorn | 10 | 0.2 |
Genoa City ranks 5 of 7 places in Walworth County by new homes authorized over five years for every 100 existing homes.
Newer homes in Genoa City against Walworth County, its state and the nation
| Genoa City | Walworth County | Wisconsin | United States | |
|---|---|---|---|---|
| Built 2020 or later | 0.8% (±1.1 points) | 1.2% (±0.3 points) | 1.4% (±0.1 points) | 2.0% |
| Built 2010 to 2019 | 4.6% (±2.6 points) | 6.5% (±0.8 points) | 7.1% (±0.1 points) | 9.4% |
| Rental vacancy rate | 20.8% (±28.2 points) | 6.2% (±1.9 points) | 4.5% (±0.2 points) | 5.5% |
In Genoa City, the share of homes built in 2020 or later is not measurably different from Walworth County (1.2%).
It is not measurably different from Wisconsin (1.4%).
It is lower than the national figure (2.0%).
Survey years: 2020–2024 (American Community Survey 5-year estimates).
Margins of error are at the 90% confidence level.
What you can do on Seayora in Genoa City
One account for renting, owning, managing and fixing homes, with these figures beside you.
Own or manage a rental?
List it, sign the lease and collect rent online, with the figures for Genoa City beside you.
Create a landlord account · See what landlords get
Looking for a place to rent?
Browse homes for rent near Genoa City, save the ones you like and apply online.
Browse rentals · Create a renter account
Do repairs, renovations or maintenance?
Get found by owners and renters near Genoa City, and send estimates and invoices from your phone.
Questions about Genoa City
How many new homes are being built in Genoa City?
In 2025, building permits were issued for 19 new homes in Genoa City, in 15 new buildings, according to the Census Bureau’s Building Permits Survey.
By type of building: single-family houses 11, buildings of two to four homes 8, buildings of five or more homes 0.
How much does it cost to build a new home in Genoa City?
The permits put the construction cost at $237,895 per new home, on average.
The value on a permit is the builder’s estimate of the construction cost; it leaves out the land and is not a sale price.
Which place in Walworth County is building the most new homes?
Over 2021–2025, Delavan authorized the most new homes in Walworth County for its size: 11.5 for every 100 existing homes (487 in all).
Is a building permit the same as a finished home?
No: a permit authorizes a home to be built; some are built years later and some never are.
Sources
- Selected Housing Characteristics (DP04), 2020–2024 ACS 5-year estimates — Genoa City village, Wisconsin
- US Census Bureau, Building Permits Survey, annual place files 2021–2025
This product uses the Census Bureau Data API but is not endorsed or certified by the Census Bureau.
Figures are published by the US Census Bureau, HUD, the Bureau of Labor Statistics and the FBI; Seayora reproduces them and does not adjust them, except where a sentence says it compares dollar figures after inflation. They describe the whole place, not any one building or street, and are not an appraisal, a rent determination, a tax bill, a safety rating or legal advice.
Figures last updated on .
Related
- Housing in Genoa City at a glance
- Renters and owners in Genoa City
- Income and affordability in Genoa City
- Home values in Genoa City
- Homeowner costs in Genoa City
- Property taxes in Genoa City
- Types of homes in Genoa City
- Bedrooms in Genoa City
- Age of homes in Genoa City
- Heating fuel in Genoa City
- Commute and cars in Genoa City
- Crime reported to police in Genoa City
- Population growth in Genoa City
- How long people stay in Genoa City
- Education in Genoa City
- Demographics of Genoa City
- Population of Genoa City
- Wisconsin landlord and tenant rules
- Housing across Walworth County
- Housing data for every place in Wisconsin