Free remodeling contract template

A remodeling contract is the agreement between a contractor and a homeowner for a kitchen, a bathroom, a basement or any other remodel: the work, the allowances for what the owner picks, the price and payments, hidden conditions, protecting the home while people live in it, and the final walk-through. Fill in the form, check the contract, then print it or save it as a PDF to sign.

What a remodeling contract should include

  • The contractor, the homeowner, the address and the contractor’s license number where required.
  • The rooms being remodeled and a clear description of the work, and what is not included.
  • Allowances for fixtures and finishes the owner will choose.
  • The price, any deposit and a payment schedule tied to stages of the work.
  • How hidden conditions, change orders and delays are handled.
  • Protection of the home, cleanup, the final walk-through and the warranty.

Allowances and hidden conditions

Most remodeling disputes start in two places. An allowance sets a budget for something the owner has not chosen yet, such as tile or a faucet, and the contract should say what happens when the choice costs more. A hidden condition is a problem found behind a wall or under a floor, and the contract should say that the work on it stops until both sides sign a change order.

The three-day right to cancel

Under the FTC’s Cooling-Off Rule, a job sold at the customer’s home for $25 or more lets the buyer cancel until midnight of the third business day. The contract must carry the cancellation statement near the signature, and the contractor must hand over two completed copies of the Notice of Cancellation form. Many states add their own home improvement rules; Seayora’s answers by state give each one with its statute.

Homes built before 1978

In a home built before 1978, a remodel that disturbs more than six square feet of painted surface in a room, or twenty square feet outside, must generally be done by an EPA lead-safe certified firm following lead-safe work practices, and the owner must first be given the EPA’s Renovate Right pamphlet. Some states run their own program in place of the EPA’s.

Remodels on Seayora

On Seayora, a contractor’s estimate, its change orders and the payments stay together on the job, so the contract’s numbers and the money match.

Frequently asked questions

What should a remodeling contract include?

The parties, the address, the rooms and the scope of work, allowances for the owner’s selections, the price and payment schedule, the dates, hidden conditions and change orders, permits, insurance, cleanup, the final walk-through and the warranty.

What is an allowance in a remodeling contract?

A budget in the price for an item the owner chooses later, such as tile, cabinets or fixtures. If the choice costs more or less, the price changes by the difference through a signed change order.

Can a homeowner cancel a remodeling contract?

A homeowner who signs at home for $25 or more can cancel until midnight of the third business day under the FTC’s Cooling-Off Rule, and some states give more time. After that, the contract’s own terms and the state’s law apply.

Is this remodeling contract template free?

Yes. Fill in the form, then print the contract or save it as a PDF. Nothing you type is stored or sent anywhere.