How Much Should a Contractor Charge per Hour? The Formula
How to set a contractor’s hourly rate: labor cost and burden, overhead per billable hour, profit, a worked example, and when to price by the job instead.
By Seayora Editorial Team · Published · Facts checked · 2 min read
Short answer: A contractor’s hourly rate should cover three things: the true cost of the labor (wage plus payroll taxes, insurance and benefits), a share of overhead for every billable hour (vehicle, tools, insurance, office, software, unbillable time), and profit. Add the burdened labor cost and overhead per billable hour, then add your profit margin. Rates vary with trade, region, demand and skill, so check the result against what similar contractors charge locally, and quote by the job when the scope is clear.
Key takeaways
- Rate = (burdened labor cost + overhead per billable hour) × (1 + profit).
- Burden adds payroll taxes, insurance and benefits to the wage.
- Divide yearly overhead by billable hours, not all hours.
- Check the result against local market rates.
- Quote by the job when the scope is clear.
How do you calculate a contractor’s hourly rate?
- Start with the wage for the person doing the work (or the wage you want to pay yourself).
- Add labor burden: payroll taxes, workers’ compensation, liability insurance and benefits.
- Total your yearly overhead and divide it by billable hours (hours you can actually charge for).
- Add burdened labor and overhead per hour.
- Multiply by 1 plus your profit margin.
| Step | Example |
|---|---|
| Wage | $30.00 an hour |
| Labor burden (assume 25%) | $30.00 × 1.25 = $37.50 |
| Overhead per billable hour | $20.00 |
| Cost per billable hour | $57.50 |
| Profit (assume 15%) | $57.50 × 1.15 = $66.13 an hour |
Why are billable hours fewer than working hours?
Driving, estimating, buying materials, callbacks, paperwork and slow weeks all take time nobody pays for directly. If you spread overhead over every hour you work instead of the hours you bill, the rate comes out too low.
Should a contractor charge by the hour or by the job?
By the job when the scope is clear: customers prefer a fixed price, and efficient work earns more. By the hour (time and materials) when the scope is uncertain, such as diagnosis or repairs behind walls. Either way, put it in writing; our guide to estimates vs quotes explains the difference, and the hourly invoice template bills time and materials.
How do you know if your rate is right?
Track every job’s actual hours and costs against what you charged, and look at what similar local contractors charge. If you win nearly every bid, you may be too cheap; if you win almost none, check your price or how you present it. Seayora’s software for contractors is free: estimates, invoices, scheduling, crews, client records and online payments, with 3.8% taken only when you are paid for a completed job.
Frequently asked questions
How much do contractors charge per hour?
It varies widely by trade, region and skill. Work out your own rate from your costs and check it against local rates rather than relying on a national average.
What is labor burden?
The costs on top of the wage: payroll taxes, workers’ compensation, insurance and benefits. It is a percentage of the wage that you must recover in your rate.
How much should a general contractor charge?
GCs usually price by the project: the cost of labor, subcontractors and materials, plus overhead and profit. The fee depends on the project and market.
How Seayora helps
Hourly invoice template: Bill time and materials with hours, rate and materials on one invoice.
How we write and check these guides: editorial standards.
Related on Seayora
- How to Calculate Mulch: Cubic Yards and Bags (Formula) — Guide. How to estimate how much mulch you need: the cubic yard formula, a table by depth, converting to bags, and a worked example for a landscaping job.
- Job Costing — Feature. Track labor, materials, and vendor costs against each work order or capital project, so you know real margin per job instead of guessing.
- Timesheets & Labor Tracking — Feature. Technicians clock in and out against a job, hours flow into job costing and invoicing, and you see real labor cost per job instead of an estimate.
- What Percentage of Income Should Go to Rent? The 30% Rule (2026) — Guide. How much of your income should go to rent: the 30% rule HUD uses to measure cost burden, the 40x rent screens landlords use, and how to set your own limit.
- New York Transfer Taxes: State Tax, Mansion Tax and NYC’s RPTT — Guide. Who pays New York State transfer tax, the mansion tax and NYC’s Real Property Transfer Tax, the rate at each price, and a worked $1.5 million example.
- Invoices, Receipts & Sales Tax for Contractors — Documentation. How a contractor invoice is built in Seayora, how sales tax is worked out for the job site line by line, what the customer sees at checkout, and when a receipt is issued.