Free painting estimate template
A painting estimate tells a customer what a job will cost before you start: the rooms or surfaces, the prep, the paint and the labor, and how long the price holds. Fill in the form, check the estimate, then print it or save it as a PDF to send.
What a painting estimate should include
- Your business name and how to reach you.
- The client’s name and the job site.
- An estimate number and the date.
- Each room or surface on its own line, priced by the square foot, the room or the job.
- Prep work, such as patching, sanding and priming, and the paint and number of coats.
- Any sales tax, shown separately.
- What is included and excluded, and the date until which the price holds.
Lead paint in older homes
In housing built before 1978, renovation work that disturbs painted surfaces can fall under the EPA’s Renovation, Repair and Painting Rule, which calls for a certified firm and lead-safe work practices. Seayora’s guide to the rule explains when it applies.
Estimates on Seayora
Seayora’s estimates price sales tax per line for the job site, with the rule cited, and become a job and an invoice when the client approves.
Frequently asked questions
How do you write a painting estimate?
List your business and the client, number and date the estimate, put each room or surface on its own line with its price, include the prep, paint and labor, add any sales tax, and say what is included and how long the price holds.
Is an estimate binding?
It depends on what it says and on state law. An estimate is usually the contractor’s expected price, while a fixed-price quote or a signed contract binds both sides to the stated price, so say which it is on the document.
How long is an estimate valid?
As long as the estimate says. A “valid until” date stops a client from accepting an old price after material costs have changed.