How to Estimate Shingles for a Roof: Squares, Pitch and Waste

How to estimate roofing shingles: measure the roof area, apply the pitch factor, convert to squares, add waste, and count bundles, with a worked example.

By Seayora Editorial Team · Published · Facts checked · 2 min read

Short answer: To estimate shingles, find the roof’s area, convert it to roofing squares (one square = 100 square feet), add a waste allowance, and multiply by the bundles per square printed on the shingle wrapper (most asphalt shingles are packaged three bundles to a square). If you measure the footprint from the ground or a plan, multiply by the pitch factor for the roof’s slope first: the factor is the square root of 1 plus (rise ÷ 12) squared, which is 1.118 for a 6-in-12 roof. Add starter strip and ridge cap separately.

Key takeaways

  • One roofing square = 100 square feet.
  • Pitch factor = √(1 + (rise ÷ 12)²); 6/12 is 1.118.
  • Add a waste allowance, more for hips and valleys.
  • Bundles = squares × bundles per square from the wrapper.
  • Count starter and ridge cap separately.

How do you calculate roof squares?

  1. Measure each roof plane (length × width) and add them, or measure the footprint including overhangs.
  2. If you used the footprint, multiply by the pitch factor for the slope.
  3. Divide the roof area by 100 to get squares.
  4. Add a waste allowance for cuts, starter and ridge; the example uses 10%, and complex roofs need more.
  5. Round up and multiply by the bundles per square on the wrapper.

What is the roof pitch factor?

Pitch factor = √(1 + (rise ÷ 12)²). Multiply the footprint by it to get the sloped area.
Pitch (rise per 12 in)Factor
4/121.054
5/121.083
6/121.118
7/121.158
8/121.202
9/121.250
10/121.302
12/121.414

How many bundles of shingles do I need? A worked example

Illustrative: a 1,500 sq ft footprint (with overhangs) at 6/12.
StepResult
Sloped area1,500 × 1.118 = 1,677 sq ft
Squares1,677 ÷ 100 = 16.77
With 10% waste16.77 × 1.10 = 18.45, round up to 19
Bundles at 3 per square19 × 3 = 57 bundles

What else goes on a roofing estimate?

Underlayment, drip edge, flashing, starter strip, ridge cap, ventilation, nails, tear-off and disposal, permits and labor. Check the shingle manufacturer’s installation instructions for exposure and nailing, which also affect coverage. The free roofing contract template and roofing invoice template carry the job from estimate to bill. Seayora’s software for contractors is free: estimates, invoices, scheduling, crews, client records and online payments, with 3.8% taken only when you are paid for a completed job.

Frequently asked questions

How many bundles of shingles in a square?

Most asphalt shingles are packaged three bundles to a square, but check the wrapper: some heavier shingles use four or more.

How much waste should I add for shingles?

Enough for cuts, starter and ridge: simple gable roofs need less, roofs with hips, valleys and dormers more. The example uses 10%.

How do I measure a roof without getting on it?

Measure the footprint including overhangs from the ground or a plan and multiply by the pitch factor; aerial measurement reports are another option.