Take-offs: Count the Materials for a Job and Price It Into an Estimate
Measure a job once — or read the rooms from a blueprint with AI — and work out every trade on it: drywall sheets laid out wall by wall, tiles counted in their pattern, receptacles and circuits by the electrical code your state adopted, and more. Then price it from your own prices into a draft estimate.
A take-off is the list of everything a job needs — how many sheets, boxes, bags, rolls and pieces, and how many hours of each kind of work. In Seayora a take-off is one job: you give it the rooms once, add the trades that work on it, and each trade is worked out from those rooms. It is under Work → Take-off on the website, the iPhone app and the Android app, and every step below works on all three.
Start a take-off
- Open Work → Take-off and choose New take-off. Give it a name (the job or the address), and if you like a client, a job and the state the work is in. The state is what the electrical calculator suggests a code edition from.
- Add the rooms: a name, a type (kitchen, bathroom, bedroom, garage and so on), the length and width, and if it differs from the rest the ceiling height, the doors and the windows. A kitchen also takes its counter length and island; a bathroom its sinks; a garage its car bays.
- Change the rooms whenever you like. Every trade already on the take-off is worked out again from the new rooms, in the same save.
Read the rooms from a blueprint
Choose Read the rooms from a blueprint and pick a photo of the plan or a PDF (the first page is read). AI reads each room, the sizes printed on the plan, and the receptacles, lights, switches and plumbing fixtures drawn in it. What it reads is shown to you first: Use these rooms replaces the rooms you have, Add to my rooms keeps them, and Discard throws the reading away. Nothing changes until you choose.
- A plan has to say how big it is. If no sizes are printed on it, give one room you measured (its name and longest side) or the total area, and the reading is scaled from that. A plan with no sizes and neither of those is refused rather than guessed.
- Every room read from a plan is marked as read from the plan, so you can check it against the drawing before you rely on it.
- The plan itself is not kept. It is sent to the AI provider your account uses to be read, and only the rooms it found are saved.
- One reading runs at a time for a business. It usually takes under a minute.
The calculators
There are 22 calculators in 5 groups (Interior, Systems, Exterior, Structure, Site). The ones for the trades you chose come first; you can use any of them.
| Calculator | Group | What it works out | First for |
|---|---|---|---|
| Drywall & sheetrock | Interior | Sheets for every wall and ceiling, laid out wall by wall, with screws, tape, compound and corner bead. | Drywall & plaster, General maintenance, Carpentry & joinery, Painting & decorating, Water & fire restoration |
| Tile | Interior | Every tile of the pattern laid out on floors, shower walls and backsplashes, with thinset, grout, backer board and trim. | Tile & stone, Flooring, Masonry & concrete, General maintenance |
| Electrical | Systems | Receptacles, lights and switches the code asks for in each room, the circuits, cable, devices, boxes and breakers. | Electrical, Low voltage / data, Solar & energy, General maintenance |
| Painting | Interior | Gallons of wall, ceiling, primer and trim paint for every room, net of doors and windows. | Painting & decorating, General maintenance, Water & fire restoration |
| Wallpaper | Interior | Strips per wall and rolls to buy, allowing for the pattern repeat. | Painting & decorating |
| Flooring | Interior | Plank, wood, laminate or carpet for each room — boxes or square yards, pad, transitions and trim. | Flooring, Carpentry & joinery, General maintenance |
| Insulation | Interior | Wall batts, attic batts or blown-in bags, or spray-foam board feet. | Insulation & weatherproofing, General maintenance |
| Roofing | Exterior | Squares, bundles, underlayment, ice and water shield, drip edge, starter and ridge cap from the roof’s footprint and pitch. | Roofing |
| Gutters | Exterior | Gutter, downspouts, elbows, outlets, end caps, hangers and guards. | Roofing, General maintenance |
| Fencing | Exterior | Posts, concrete, rails, pickets or panels and gates for a fence line. | Carpentry & joinery, Landscaping & grounds, General maintenance |
| Decks | Exterior | Deck boards, joists, beams, posts, footings, hangers, fasteners, railing and stairs. | Carpentry & joinery, Landscaping & grounds, General maintenance |
| Siding | Exterior | Squares of siding net of windows and doors, with J-channel, starter, corners and house wrap. | Roofing, Carpentry & joinery, General maintenance |
| Stucco | Exterior | Three-coat, one-coat or EIFS stucco for the outside walls, with paper, lath, beads, weep screed and control joints. | Masonry & concrete, Painting & decorating, General maintenance, Water & fire restoration |
| Wall framing | Structure | Studs, plates, header stock, sheathing and nails for a run of walls. | Carpentry & joinery, General maintenance |
| Concrete | Structure | Cubic yards or bags for a slab, a footing or piers, with rebar, mesh, vapor barrier, gravel and forms. | Masonry & concrete, Landscaping & grounds, General maintenance |
| Masonry | Structure | Concrete block, brick veneer or stone veneer for a wall, with mortar, ties, lath and rebar. | Masonry & concrete, General maintenance |
| Plumbing rough-in | Systems | Supply and drain pipe, valves, traps, flanges and fittings from the fixtures on the job. | Plumbing, General maintenance |
| Heating & cooling | Systems | A rule-of-thumb size, supply registers, returns, duct, line set and thermostats. | HVAC / refrigeration, Heating & boilers |
| Solar | Systems | Panels to cover a yearly use, racking, clamps, attachments and inverters, with the production it should make. | Solar & energy, Electrical, Roofing |
| Landscaping materials | Site | Cubic yards or bags of mulch, soil, compost, gravel or sand, pallets of sod, seed, edging and fabric. | Landscaping & grounds, Snow & ice removal |
| Pavers & patios | Site | Every paver of the pattern laid out on the patio, with gravel base, bedding sand, joint sand and edging. | Masonry & concrete, Landscaping & grounds |
| Cleaning | Site | Labor hours and time on site for a standard, deep, move-out or after-construction clean. | Cleaning & janitorial |
Each calculator has its own fields with a sensible starting value — sheet size and finish level for drywall, tile size, pattern and grout joint for tile, wire runs and appliances for electrical — and you can change any of them. The answer appears as you type: a summary, what to buy, the labor in units you can price, notes on what was assumed, and for some trades a drawing.
- Tile and planks are counted one by one in the pattern, every cut piece included, however big the floor — a large floor is counted row by row rather than drawn tile by tile.
- Insulation counts the outside walls of the plan, floor by floor, traced from where the rooms sit. Choose Outside and inside walls to insulate the walls between rooms for sound; each of those walls is counted once. Rooms typed without a place on a plan count every wall of every room, and the answer says so.
- Wallpaper is cut from separate rolls for each wall height. A picket fence is counted with the usual 2½ inch gap unless you give yours. A shingle roof under 4/12 gets two layers of underlayment, and under 2/12 the answer says it needs a low-slope roof instead.
- Every calculator is checked against a library of sample plans — from a powder room to an 80,000 sq ft warehouse — before a change ships.
See it in 3D
Most trades draw what they worked out as a 3D model of the job, so you can see where every number came from. Drywall shows every sheet on every wall, numbered in the order it goes up — an offcut reused on the next wall carries the number of the sheet it was cut from, so "12b" is the rest of sheet 12. Framing shows every stud, plate and header; electrical every receptacle, switch and light with the cable runs between them; tile every whole and cut tile; and decks, fences, roofs, insulation, flooring, paint, wallpaper, concrete, block and solar panels the same way. Screws, nails, tape and other small things stay in the list of what to buy.
- Turn the model by dragging, zoom with a pinch (or Ctrl and the scroll wheel on a computer), and look from the top or the front.
- The near walls of each room are cut away so you can see inside. Switch that off, or switch any layer on or off — walls, sheets, ceilings, studs, wiring — under Layers.
- Pick one room to see only its pieces and its own counts ("Kitchen: 14 sheets").
- Build it piece by piece: play the pieces in the order they go up, or step through them one at a time.
- Tap a piece to read it — its number, its size, the cut, the room and wall, the board or circuit.
- The piece list is the same model as a list you can read or download — a cut list for the crew. Save or share a picture of the model to send it.
- Rooms read from a blueprint sit where the plan shows them. Rooms you typed are placed side by side, and the model says so. Doors and windows are drawn where the picture needs them; the count does not depend on where they are.
- The numbers are the take-off's own. The model draws the pieces the count is made of, and the totals under it — sheets in the model, extra for breakage, sheets to buy — are the same numbers that are priced. Where a drawing is only a guide, such as cable runs or a floor bought by area, it says so.
Every area, length and volume is also shown in its other units — square feet with square metres and square yards, feet with metres. You can type a measurement in any unit: 12' 6", 12-6, 3.8 m, 450 cm or 20 m² are all read and converted, and a measurement in the wrong kind of unit is refused in words, never guessed.
How Seayora checks its own math
When you save a trade, Seayora also has AI work the same quantities out on its own, in the background, from the same measurements and settings. You do not see the AI's numbers and your take-off never changes because of them — your quantities are the ones priced and put on an estimate. Seayora keeps both answers and its own team goes over the ones that differ, to find where its figures can be better.
- What is sent to the AI is the job's measurements, the settings and the worked-out quantities — not your prices, your client or your business's name. It is never kept to train AI.
- An administrator can switch the background check off for an account, a group or an account type.
How Seayora's figures improve
Some fields are planning figures — screws a square foot, coverage a gallon, waste. When the checks show that one of them should move, and Seayora's team agrees after looking at the jobs, Seayora proposes a new standard figure. It moves at most 10% at a time and an administrator applies it unless automatic learning has been switched on. A field that starts at a learned figure says so. You can always type your own number.
Only planning figures learn. The geometry (how sheets and tiles are laid), the electrical code rules and the unit conversions are never changed by AI; a check that shows a mistake in the math itself is fixed by Seayora's engineers.
Drywall, sheet by sheet
Drywall is laid out wall by wall, in the orientation you choose, with offcuts from one wall reused on the next in the same room — so the count is the sheets you would actually hang, not the area divided by a sheet. You can switch to the area method instead and set its waste. Screws, joint tape, compound by the finish level you choose (Level 0 to Level 5) and corner bead are counted from the same layout. The drawing shows every wall with its sheets.
Tile, in its pattern
Tile is counted by laying the pattern over each floor, wall and backsplash — straight, ½, ⅓ or ¼ offset, diagonal, diagonal brick, herringbone, herringbone at 45°, double herringbone, basketweave, hexagon or pinwheel — and counting the full tiles and the cut ones. So a pattern's cuts are already in the count, and the overage you add is only for breakage and spares. You can lay the long side along the room or across it, start from a tile centered in the room or from a corner, and choose the material (porcelain, ceramic, natural stone, glass or cement tile). Thinset by your trowel, grout by your joint and tile thickness, backer board, waterproofing on shower walls and edge trim come from the same areas. The drawing shows the pattern as laid.
- In a straight or offset lay, the piece cut off one end of a row starts another row when both pieces fit in one tile, the way a setter works — so those cuts do not each cost a tile. Choose Never reuse them under Row-end offcuts if you would rather not.
- A pinwheel counts its large squares and its small ones separately, so you buy the right number of each.
- A border of one or two rows round each floor is laid as its own pieces, with its own tile size, and the field inside it is counted on its own.
- Mosaic tiles can be bought as sheets: the count is the sheets that cover the area, each cut sheet counted once.
- Also on the list when you ask for them: leveling clips for large tiles, an uncoupling membrane under floor tile, a heated floor (the mat kept 6 in off the walls and a thermostat for each room), bullnose or metal edge trim at the top of wall tile, sealer for stone and cement tile, and shower niches.
Siding, stucco and roofing, measured from the plan
When the rooms are placed on a plan — read from a blueprint, or placed by hand — siding, stucco and roofing measure the outside of the building from it: each floor's outline, every wall clad to its room's ceiling, the band between two floors only where a floor sits above that wall, the gable ends from the roof shape, the windows of the rooms with an outside wall, the garage door bays, and every outside and inside corner. Walls drawn a few inches apart are treated as one wall, because rooms read off a drawing rarely meet exactly. If the rooms are not placed, the measurements you type are used instead, and the answer says which it used. You can also choose to use the plan or your own measurements every time.
- Floors stack by their names — Basement, Level 1 or Main floor, Level 2, Second floor or Upstairs, and a loft or attic on top — never by the order the rooms were added.
- A basement or cellar is below the ground: its walls are not clad and the roof does not cover it. Its bathrooms still count for the plumbing vents through the roof.
- Where two rooms on one floor overlap, the taller room's wall is the one measured.
- Siding is counted by its exposure (the reveal) times its length — vinyl, fiber cement, wood, engineered wood, board and batten, cedar shingles or steel panels — with J-channel, starter, corner posts or boards, house wrap, soffit and fascia. The exposure printed on the box wins over the usual figure. A corner board runs its corner’s full height, so each side is its own board; caulk runs both edges of every casing and corner board, at the tube yield you set.
- Stucco can be three-coat, one-coat over foam or EIFS, with the paper (two layers over wood sheathing), lath, weep screed, casing bead, corner aid and control joints spaced as ASTM C1063 asks: no panel over 144 sq ft and no joint more than 18 ft from the next.
- Roofing from the plan takes the roof area from the footprint and the pitch, the eaves, rakes, ridge, hips and valleys from the outline, step flashing where an upper wall rises from a lower roof, box vents by the 1/300 ventilation rule unless you use a ridge vent, and plumbing vent boots — one, plus one for each bathroom. Shingles, standing-seam metal, concrete tile and cedar shakes are each counted their own way, and a low slope gets the underlayment the code asks for.
Electrical, by the code your state adopted
The electrical calculator places what the National Electrical Code asks for in each room — receptacles along the walls and counters, the island, bathrooms, laundry, garage bays and outdoors, the lighting outlets and switches — and then the circuits, cable by type and length, boxes, devices and breakers, with AFCI and GFCI protection as the edition requires. Each line names the section it comes from.
- The edition is suggested from the state of the job, and you can change it. Some rules differ between editions — for example the island receptacle rule changed in 2023, and garages need one receptacle for each car bay from 2020.
- The suggestion is a starting point, not a ruling. Cities and counties can adopt a different edition or amend it, and the inspector who signs the job decides. Check with your local authority before you rely on it.
- It counts what the code asks for, not a load calculation: service size and feeder sizing (NEC Article 220) are left to you, and the notes say so.
Price it into an estimate
Under Prices you keep your own price for every material and kind of labor — a cost with your markup, or a price used as it is — plus your hourly rate, a trip charge and a minimum job. Or write how you price a job in your own words ("$1.85 a square foot to hang and finish drywall, 20% on materials, $75 trip charge, $500 minimum") and AI fills the prices in for you to check; nothing is saved until you save.
- The Estimate tab of a take-off shows every line priced from your prices and the total before tax. A material or labor line with no price is listed as having no price yet and left off — Seayora never invents a price.
- Make the estimate turns those lines into a draft estimate in Estimates, for the client you choose. Nothing is sent to anybody; you review it, change it and send it there as you would any estimate. Sales tax is worked out on the invoice.
- In an estimate you are writing, From a take-off adds the priced lines of any take-off to it.
Your trades
Choose every trade you work in — on the Take-off page, or under Settings → Business profile → Your trades. Their calculators come first, and the trades you choose also decide which starter checklists you are offered. You can change them at any time.
Who can use it
- Take-offs are for contractor accounts. On a team, anybody who can work on estimates can use them; anybody who can only see estimates can see take-offs but not change them.
- It is a page you add to your app: if you do not see Take-off under Work, add the Take-offs & estimating pack from the app library.
- An administrator can switch Take-offs, any one calculator, blueprint reading, the pricing reader or the background AI check off for an account, a group or an account type, or limit how often they can be used. A calculator that is switched off for you is not shown.
Ask your assistant
If you connect Claude or ChatGPT to Seayora, it can work out a trade's quantities for rooms you describe — with the steps and the planning figures it used — list your take-offs and read one. It cannot change them or make an estimate from one, and the 3D model is drawn only in Seayora itself.
What it is not
A take-off is an estimating aid. The quantities and the code suggestions are worked out from what you enter and from published rules of thumb, and they can be wrong for your job — check them before you order or bid. It is not an engineering design, a load calculation, a permit drawing or a statement that work meets code.
The electrical code by state
The edition each state has adopted, from codesofrecord.com — NEC adoption by state (as of 2026-11-17, read 2026-11-18): https://codesofrecord.com/nec/. A state not listed here has no entry yet, and the calculator asks you to choose the edition.
| State | Edition | In force since | Applies to |
|---|---|---|---|
| AL | NEC 2020 | 2022-07-01 | State buildings only |
| AR | NEC 2026 | 2026-09-03 | |
| AZ | Set by each city or county | — | |
| CA | NEC 2023 | 2026-01-01 | |
| CO | NEC 2026 | 2026-08-01 | Statewide minimum |
| CT | NEC 2020 | 2022-10-01 | |
| DC | NEC 2014 | 2020-05-29 | |
| DE | NEC 2023 | 2026-01-01 | |
| FL | NEC 2020 | 2023-12-31 | |
| GA | NEC 2023 | 2025-01-01 | Statewide minimum |
| IA | NEC 2023 | 2025-07-01 | |
| ID | NEC 2023 | 2024-04-19 | |
| IL | Set by each city or county | — | |
| IN | NEC 2008 | 2009-08-26 | |
| KS | NEC 2008 | 2011-02-04 | Statewide with exceptions |
| KY | NEC 2023 | 2025-01-01 | |
| LA | NEC 2020 | 2023-01-01 | |
| MA | NEC 2026 | 2026-04-24 | |
| MD | NEC 2017 | — | Statewide with exceptions |
| ME | NEC 2026 | 2026-07-01 | |
| MI | NEC 2023 | 2024-03-12 | |
| MN | NEC 2026 | 2026-08-17 | |
| MO | Set by each city or county | — | |
| MS | Set by each city or county | — | |
| MT | NEC 2023 | 2026-09-26 | |
| NC | NEC 2020 | 2021-11-01 | |
| ND | NEC 2026 | 2026-07-01 | |
| NE | NEC 2023 | 2024-08-01 | |
| NH | NEC 2023 | 2025-07-01 | |
| NJ | NEC 2023 | 2026-08-17 | |
| NM | NEC 2020 | 2023-03-28 | |
| NV | Set by each city or county | — | |
| NY | NEC 2023 | 2025-12-31 | Statewide with exceptions |
| OH | NEC 2023 | 2024-03-01 | |
| OK | NEC 2023 | 2024-09-14 | Statewide minimum |
| OR | NEC 2026 | 2026-10-01 | |
| PA | NEC 2020 | 2026-01-01 | Statewide with exceptions |
| RI | NEC 2023 | 2025-12-01 | |
| SC | NEC 2020 | 2023-01-01 | |
| SD | NEC 2023 | 2024-11-12 | |
| TN | NEC 2017 | 2018-10-01 | |
| TX | NEC 2026 | 2026-09-01 | |
| UT | NEC 2023 | 2025-07-01 | |
| VA | NEC 2020 | 2024-01-18 | |
| VT | NEC 2023 | 2025-11-05 | |
| WA | NEC 2023 | 2024-04-01 | |
| WI | NEC 2023 | 2026-09-01 | |
| WV | NEC 2020 | 2022-08-01 | Local adoption |
| WY | NEC 2026 | — |
Related features and guides
- How to Estimate Shingles for a Roof: Squares, Pitch and Waste — Guide. How to estimate roofing shingles: measure the roof area, apply the pitch factor, convert to squares, add waste, and count bundles, with a worked example.
- Electrical Contractor Software: Estimates to Payment — Feature. Free electrical contractor software: estimates with materials, change orders, crews, license reminders, job costing and invoices paid online.
- Floor Plans: Draw, Scan, Trace or Map a Home From a Video — Documentation. Draw a home to scale — walls, rooms, doors, windows, built-ins and dimension lines — start it from a scan, a walkthrough video or an existing plan, measure with a Bluetooth laser, see its ANSI area and a contractor's takeoff, download it as a PDF or CAD file, and show it on your listing in plan, color, blueprint or 3D.
- Free Construction Estimating Software — Feature. Free construction estimating software: line items with units and your cost, sales tax by line, online approval, and the estimate turned into the job.
- Price Rules and Price Levels — Documentation. Discounts, markups, fixed prices and price levels — for everybody, a group of customers or one customer, on every item, a type, a trade or one item — and exactly which one wins.
- Painting Business Software: Estimates and Invoicing — Feature. Free painting business software: estimates by area with materials and your cost, change orders, crews, scheduling, photos and invoices paid online.